SD22A/0051: Land recontouring/infilling works on c 16,000sq.m of a folio size of c 2.4 ha (allowing buffers); the volume of material to be placed on the site is c 35,000sq.m with an average fill level of c 3.5m above existing - the material is clean, inert soil and stone from the Saggart Water Reservoir construction site located directly adjacent to the north of the proposed infill site; a small section of hedgerow (6m wide) will be required to be removed between Saggart Water Reservoir construction site and the proposed infill site to allow access for lorries and infill equipment onto the proposed infill site.
Saggart, Slade, Dublin 24,
DecisionGrant permission
Decided01 June 2022
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for South Dublin has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- S00B/0007Extension to side of house and retention of existing conservatory. / 0.2 km away / 28 February 2000Granted
- SD19B/0267Front single storey porch to existing single storey house and all associated site development works. / 0.2 km away / 02 September 2019Granted
- SD18A/0180(1) Provision of a new 100,000m3 covered reservoir approximately 31,520sq.m with height above ground up to 6.7m approximately without hand railing on the roof (up to 7.9m approximately with hand railing). (2) Provision of an adjoining inlet valve house approximately 1560sq.m with height above ground up to 9.0m approximately without hand railing (approximately 10.2m with hand railing). (3) Provision of an adjoining outlet valve house approximately 575sq.m with height above ground up to 9.0m approximately without hand railing (approximately 10.2m with hand railing). (4) Provision of a new building (OCSE building) housing an ESB substation, chlorination plant and associated equipment, de-chlorination plant, a backup power generator, controls and welfare facilities; approximately 25m by 17m in plan and approximately 9.6m high to the apex. (5) 2 bunded silo tanks with overall height of approximately 5.9m above ground level adjacent to the new OSEC building surrounded by a security wall. (6) Demolition of the existing buried reservoirs and redundant above ground buildings/structures. (7) New site entrance from Castle Road. (8) Landscaping and fencing works. The proposed development includes all associated site development works, hardstanding areas, provision of drainage collection systems with hydrocarbon interceptor and attenuation systems and provision of a temporary construction compound area. All necessary ancillary pipework, mechanical and electrical services, plant, instrumentation, automation and controls and equipment. All of the above is proposed on a site of approximately 13.5 hectares. / 0.2 km away / 16 July 2018Granted
- SD16B/0215Single storey domestic extension to rear of existing bungalow and internal alterations. The extension works comprise of 70sq.m to include new kitchen/dining area and extended bedroom & ensuite. / 0.2 km away / 29 August 2016Granted
- SD16A/0120The construction of a new treated water storage tank, salt saturator storage tanks and associated site works including site drainage, fencing and site access - all within the site of the existing treated water storage tanks. The works are part of the Strategic Watermain Link between Leixlip and Saggart. / 0.2 km away / 02 June 2016Granted
- SD21B/0236Single storey extension to side of existing bungalow and internal alterations comprising of 91sq.m to include new sitting room, bathroom and bedroom with en-suite. / 0.2 km away / 17 June 2021Granted
- SD06A/0302(a) The replacement of the existing chlorination facility with an on-site electrolytic chlorination plant - the plant is contained in a single storey, steel framed and clad building with brickwork walls up to 2.4m ftom ground level and with a floor space of 157.25 sq.m; (b) the replacement of the existing boundary chainlink fence with a coloured green palisade fence of similar height. / 0.2 km away / 02 June 2006Granted
- S99A/0644Replace its existing chlorination facility with an on-site Electrolytic Chlorination Plant (OSEC). The plant is contained in a single storey steel framed and clad building with a floor space of 157.25sq.m. / 0.2 km away / 12 November 1999Granted