SD22A/0269: Signage for Unit E including the provision of 1 halo illuminated sign to the north eastern elevation; and all associated works. (Development site at Unit E in the townland of Collegeland, Baldonnel Business Park, Dublin 22; the site is under construction and located between Casement Aerodrome and the N7 national route)
Unit E, In the Townland of Collegeland, Baldonnel Business Park, Dublin 22
DecisionGrant permission
Decided04 August 2022
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for South Dublin has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- SD22A/0026Canopy waste compactor/baler on south western elevation and all associated site works on a site under construction and located between Casement Aerodrome and the N7 national route. The proposal amends a previously permitted development under SDCC Reg. Ref. SD20A/0215. / 0.0 km away / 25 March 2022Granted
- SD21A/0320Amendment to previously permitted Ref. SD20A/0215 consisting of signage for Unit E including the provision of, 2 way finding signs located at entrances to Unit E; 2 totem signs located to the west and north of Unit E; 3 halo illuminated signs to the south-western, north-eastern and south-eastern elevations; all associated works. / 0.1 km away / 24 January 2022Granted
- SD20A/0215The construction a logistics/warehouse unit (Unit E) southwest of Mountpark Baldonnell Phase 1 and west of the older original Business Park, Unit E will comprise of a GIA 60,747sq.m (including 2,020sq.m of ancillary office space and 4,802sq.m of other ancillary areas); Provide for 340 car parking spaces, 22 motorcycle parking spaces and 160 bicycle spaces to serves the proposed development; Flood mitigation works to store and attenuate flood flows from the River Camac; Formations of plateaux on the site with surplus excavated material to allow for future development of Unit F; Access to the site will be from the existing Phase 1 development (referenced above) located on Clonlara Road; amendments to the yard and entrance arrangement for permitted Unit D are proposed (SD19A/0048); All ancillary landscaping, internal roads, associated infrastructure and buildings and site development works to support the development which is primarily greenfield and located between Casement Aerodrome and the N7 national route. The proposal will form part of the second phase of development to that permitted under SD19A/0370 and Phase 1 under SD15A/0309 (ABP Ref. PL06S.246392), as amended by permissions SD17A/0362, SD18A/0266 and SD19A/0048. An Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority with the planning application. / 0.1 km away / 15 October 2020Granted
- SD19A/0370Construction of two logistics/warehouse units (Unit C & D) southwest of Mountpark Baldonnell Phase 1 and west of the older original Business Park. Unit C will comprise of a GIA 11,492sq.m (including 592sq.m of associated office space); Unit D will comprise of a GIA 7,856sq.m (including 400sq.m of associated office space); provide for 193 car parking spaces and 56 bicycle spaces to serve the proposed development; flood mitigation works to store and attenuate flood flows from the River Camac; formation of plateaus on the site with surplus excavated material to allow for future development; access to the site will be from the existing Phase 1 development located on Clonlara Road; all ancillary landscaping, internal roads, associated infrastructure and site development works to support the development; the site is primarily greenfield and located between Casement Aerodrome and the N7 national route; the proposal will form a second phase of Development to that permitted under SD15A/0309 (ABP Ref. PL06S.246392) as amended by permissions SD17A/0362, SD18A/0266 and SD19A/0048; An Environmental Impact Assessment Report (EIAR) is submitted with the planning application. / 0.1 km away / 29 January 2020Granted
- SD21A/0230Construction 2 logistics/warehouse units (Unit F and Unit G amounting to 15,168sq.m GIA in total) south west of Mountpark Baldonnell Phase 1 and west of the older original Business Park; Unit F will comprise a GIA 6,463sq.m (including 568sq.m of ancillary office space), 65 car parking spaces and 20 bicycle spaces; Unit G will comprise a GIA 8,705sq.m (including 608sq.m of ancillary office space) 87 car parking spaces and 28 bicycle spaces; flood mitigation measures as permitted under SD20A/0215 and SD20A/0319 will service the development and are under construction; access to the site will be from the existing Phase 1 development (referenced below) located on Clonlara Road; totem wayfinding signage; all ancillary landscaping, PV panels; internal roads, associated infrastructure and buildings and site development works to support the development at the townlands of Moneenalion Commons Upper, Brownsbarn and Collegeland, Baldonnell Business Park, Dublin 22; the site is primarily greenfield and located between Casement Aerodrome and the N7 national route; the proposal will form part of the second phase of development to that permitted under SD20A/0215, SD19A/0370 and Phase 1 under SD15A/0309 (ABP Ref. PL06S.246392), as amended by permissions SD17A/0362, SD18A/0266 SD19A/0048 and SD20A/0319; an Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority with the planning application. / 0.1 km away / 19 October 2021Granted
- SD20A/0319Amend permitted logistics/warehouse units C and D and incorporate other amendments, providing for a resultant; Unit C, 7,937sq.m including 757sq.m ancillary office space (permitted 11,492sq.m total); Unit D, 12,050sq.m including 911sq.m ancillary office space (permitted 7, 856sqm total); Overall increase of 639sq.m for Units C and D; provision of maintenance ramp to swale; resultant amendments to site layout, minor revisions to flood mitigation strategy, yards, elevations, signage, internal road layout, landscaping, ground works, drainage, gates, fencing, services and utilities and all associated and ancillary site development works at a site at the townlands of Moneenalion Commons Upper, Brownsbarn and Collegeland, Baldonnell Business Park and is located between the Casement Aerodrome and the N7 national route and comprising of amendments to the second phase of development permitted under Ref. SD19A/0370 & SD20A/0215. / 0.1 km away / 15 March 2021Granted
- SD23A/0099Installation of 1 no. external air handling unit and associated ductwork to existing Unit F. / 0.3 km away / 01 September 2023Granted
- SD23A/0307Installation of 1 no. external permanent site back up generator to the north of the site. / 0.3 km away / 19 January 2024Granted