SD22A/0420: Development on a Site that includes a two storey residential property on lands to the south of the New Nangor Road (R134), Dublin 22; and on land within the townlands of Ballybane and Kilbride within Profile Park, Clondalkin, Dublin 22 on an overall site of 3.79hectares; The development will consist of the demolition of the two storey dwelling (207.35sqm) and associated outbuildings and farm structures (348.36sq.m); and the construction of 1 two storey data center with plant at roof level and associated ancillary development that will have a gross floor area of 12,893sqm that will consist of the following, 1 two storey data center (Building 13) with a gross floor area of 12,893sqm. It will include 13 emergency back-up generators of which 12 will be double stacked and one will be single stacked within a compound to the south-western side of the data center with associated flues that each will be 22.316m in height and 7 hot-air exhaust cooling vents that each will be 20.016m In height; The data center will include data storage rooms, associated electrical and mechanical plant rooms, loading bays, maintenance and storage spaces, office administration areas, and plant including PV panels at roof level as well as a separate house generator that will provide emergency power to the admin and ancillary spaces. Each generator will include a diesel tank and there will be a refuelling area to serve the proposed emergency generators; The data center will have a primary parapet height of 14.246m above ground level, with plant and screen around plus a plant room above at roof level. The plant room has an overall height of 21.571m; Construction of an internal road network and circulation areas, with a staff entrance off Falcon Avenue to the east, as well as a secondary vehicular access for service and delivery vehicles only across a new bridge over the Baldonnel Stream from the permitted entrance as granted under SDCC Planning Ref. SD21A/0241 from the south-west, both from within Profile Park that contains an access from the New Nangor Road (R134); Provision of 60 car parking spaces (to include 12 EV spaces and 3 disabled spaces), and 34 cycle parking spaces; Signage (5.7sq.m) at first floor level at the northern end of the eastern elevation of the data center building; Ancillary site development works will include footpaths, attenuation ponds that will include an amendment to the permitted attenuation pond as granted to the north of the Baldonnel Stream under SDCC Planning Ref. SD21 A/0241, as well as green walls and green roof. The installation and connection to the underground foul and storm water drainage network, and installation of utility ducts and cables, that will include the drilling and laying of ducts and cables under the internal road network within Profile Park. Other ancillary site development works will include hard and soft landscaping that will include an amendment to the permitted landscaping as granted under SDCC Planning Ref. SD21A/0241, lighting, fencing, signage, services road, entrance gates, and sprinkler tanks; An Environmental Impact Assessment Report (EIAR) has been submitted with this application.
Site within the townlands of Ballybane & Kilbride, Clondalkin, Dublin 22
DecisionRefuse permission
Decided29 May 2023
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
Refusal reasons not machine-readable
Documents are indexed. Reason extraction for South Dublin has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- SD22A/015610 year permission on a site is bounded to the east and south by Grange Castle Golf Club, to the north by Nangor Road (R134) and to the west by an estate road known as Falcon Avenue) for modifications to the permitted data centre granted under SDCC Reg. Ref. SD21A/0186 comprising the following, reconfiguration and alterations to the data centre building to include removal of front of house offices at third floor level, alterations to floor levels at second floor to provide consistency between front of house and data halls, parapet height increase of front of house to c.16.8m, provision of storage at second floor level in lieu of relocated internal generators to the external generator yard and associated elevational alterations; extension of loading dock at ground floor level by c.6osqm in area with minor height increase to c.5.3m; removal of 3 air plenums to the front (north) elevation and provision of screening to generator flues in lieu of omitted plenums; alterations at roof level to include removal of 2m high gantry screening; alterations to the permitted generator plant yard to the north of the data centre to include the removal of fuel tanks, reconfiguration of plant and generators, provision of 2 additional external generators (increase from 5 to 9 external generators), provision of 4 additional external plant rooms, provision of diesel pump tank cabinets and stepover, relocation of generator yard doors and enlarged generator yard to accommodate the proposed modifications; increase in plant areas by c.77sq.m; reconfiguration of plant within the permitted chiller plant yard to the south of the data centre; removal of 1 sprinkler/water tank and removal of stairs and door to the side of the waste compound; reconfiguration of car parking and motorcycle spaces and removal of 1 accessible space. 64 total number of car parking spaces; the proposal also includes provision of on-site gas power generation compound ( c.2,604sq.m in area) in the area previously reserved for a future data centre; the compound comprises 7 modular plant rooms (totalling c.180sq.m in area), 10 gas fired generators and associated flues c.14.7m high, gas skid, associated modular plant, boundary treatment surrounding the compound c.6.5m high and 2 vehicular access points including general and emergency access; all associated site development works, services provision, drainage works, access, landscaping and boundary treatment works; no buildings are proposed above the existing ESB and SDCC wayleaves to the west and north of the site; the overall Gross Floor Area of the development is reduced by c.44sq.m to c.9,795sq.m from previously permitted under SDCC Reg. Ref. SD21A/0186; the application is accompanied by a Natura Impact Statement. / 0.2 km away / 08 August 2023Refused
- S00A/0259Relocation of site entrance and construction of 760 sq.m. light industrial building and associated site works. / 0.2 km away / 15 June 2000Refused
- SD22A/0029Widening of the site entrance to provide for a separate lane for the entrance and exit of cars to separate car traffic from heavy good vehicle traffic and associated works at Kilcarberry Business Park, Clondalkin, Dublin 22. / 0.2 km away / 30 March 2022Refused
- SD15A/0277(1) Installation of overground oil storage tanks; (2) underground interceptors, slit trap, flume chamber and associated ancillary site works. / 0.2 km away / 23 March 2016Refused
- SD12A/0002/EPRevisions and alterations to the permitted development of a data processing facility under planning reference SD11A/0023 consisting of minor alterations to the four permitted data centre/warehouse structures, additional internal floor areas, alterations to sub-station structures and car park layout to be provided on a phased basis (it is proposed to extend the life of the planning permission to 7 years). The construction of the four data centre/warehouse buildings totals 23278 sq.m. (an increase of 2188sq.m.) and associated site works comprising the following areas: Two Type 'A' buildings each with 1872sq.m. of data halls, 697sq.m. of offices/recption, 1934sq.m. of support space/staff facilities/internal plant giving each a total internal floor area of 4503sq.m. (previously 3582sq.m.) and 1483sq.m. of external plant - total area for both Type 'A' is 11972sq.m. (previously 11094sq.m.); Two Type 'B' buildings each with 1872sq.m. of data halls, 419sq.m. (previously 67sq.m.) of offices/reception; 1879sq.m. support space/staff facilities/internal plant giving a total internal floor area of 4170sq.m. (previously 3005sq.m.) and 1483sq.m. of external plant - total area for both Type 'B' structures is 11306sq.m. (previously 9996sq.m.) The Data Centre part of the building is single storey reaching a maximum of 8.6m in height; the plant area is to a maximum of 10.7m high (increase from 9m) and the tallest building is Type 'A' office building is 12.5m in height (increase from 10m). 4 substations accessed from the estate road to facilitate the development are now proposed; each has an area of 49sq.m. and will be 3.75 metres in height. The development will be constructed in 5 phases initially with the enabling site works and 2 substations; the subsequent phases will contain a single warehouse building starting with the northern-most building. A total of 84 car parking spaces will be provided together with recycling storage and all ancillary services and landscaping. There will be 2 site entrances from vehicular accesses permitted as part of business park infrastructure (SD06A/0568). / 0.5 km away / 07 August 2019Refused
- S02A/0097Change of use from Residential To Irish Cultural and Language Institute and for a new Bio - Cycle unit / 0.5 km away / 22 May 2002Refused
- SD24A/0164WTen-year planning permission is sought for the expansion of existing Google Ireland Limited operations at Grange Castle Business Park South, Dublin, including the development of a 72,400m² data storage facility which will incorporate data halls with associated support areas, a high voltage compound, offices and staff facilities, a loading area, mechanical and electrical yards, internal and external utilities, security fence and gates, landscaping including acoustic screening, 2 no. stormwater attenuation ponds, additional internal vehicle and pedestrian infrastructure, together with ancillary buildings and site infrastructure. The development also includes the creation of a new active travel thoroughfare connecting Grange Castle Business Park South and Profile Park Road. / 0.6 km away / 22 August 2024Refused
- SD18A/0134/EPDemolition of the existing single storey house of 'Erganagh' and the construction of a two storey data centre and delivery bays with associated three storey office block and services that will have a gross floor area of 35,426sq.m on an overall site of 9.2 hectares. The two storey data centre facility and delivery bay (32,419sq.m) will be separated into two adjoined blocks over two floors with a single data hall on each floor of each data centre with service and technical space around each data hall (4 data halls overall) with a two storey delivery bay attached to the east of the data centre block. A three storey office block and delivery bay (2,882sq.m) is attached to the west of the data centre block. The data centre will be served by services and plant to the north of the data centre blocks that will include 32 standby generators with 2 associated flues per generator (64 in total) and grouped into 16 towers of flour flues each (each 20m high). There are proposed to be 32 acoustically attenuated chillers located on the upper level plant gantries to the north of the data hall blocks (eight on each gantry). The development will also include a new substation with associated transformer yard and single storey transformer building (125sq.m) that will be located to the northeast of the site. The development will be accessed from the Grange Castle South Access Road from the north via the Baldonnel Road and will also include ancillary site development works, including 2 attenuation ponds, to connect to existing Grange Castle infrastructural services as well as fencing, signage, services road, entrance gate, 70 car parking spaces including 3 disabled car parking spaces, and 30 sheltered bicycle parking spaces. The development will be enclosed with landscaping to all frontages including a wetland to the west all on a site (9.2ha) located within lands in the Grange Castle Business Park South and the residential properties of Erganagh, Kent Cottage and Weston Lodge on land with the townlands of Aungierstown and Ballybane; Ballybane; and Milltown and bounding Baldonnel Road to the west and south and Grange Castle South Access Road to the north, Baldonnel, Dublin 22. An Environmental Impact Assessment Report (EIAR) has been submitted with this application. / 0.9 km away / 07 September 2023Refused