SD22B/0461: Attic conversion to include the reconfiguration of the side roof profile from hipped to dutch half hipped and to include a dormer window structure within the front roof slope and rear roof slope and rooflights within the front roof slope.
19, Johnsbridge Avenue, Lucan, Co. Dublin.
DecisionGrant permission
Decided13 December 2022
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for South Dublin has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- SD06B/0006The extension to existing dwelling consisting of a new breakfast room, family room & utility room at ground floor level and 2 no. bedrooms with a bathroom at first floor level. / 0.0 km away / 21 February 2006Granted
- SD21B/0149Construction of a single storey pitched roof side extension the existing house and necessary ancillary site development works to facilitate this development. / 0.0 km away / 13 May 2021Granted
- SD06B/0238Extension to existing dwelling consisting of a new breakfast room, family room, utility room and conservatory at ground floor level and modifications to existing bedrooms with a bathroom at first floor level. / 0.0 km away / 27 September 2006Granted
- SD25B/0226WPlanning Permission for an Attic conversion to include the reconfiguration of the side roof profile from hipped to Dutch half hipped and to include rooflights within the front roof slope and a dormer window structure and a rooflight within the rear roof slope / 0.0 km away / 10 June 2025Granted
- SD24B/0171WConversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs, flat roof dormer to the rear and installation of 2no. roof windows to the front / 0.0 km away / 17 June 2024Granted
- SD18B/0196Construction of two pitched dormer extensions to rear and side of existing roof & attic space for study/storage use, a new frosted window to side gable and 1 new window to rear dormer extension. / 0.0 km away / 28 June 2018Granted
- SD19B/0348Construction of 2 new dormer roof/windows to the side and the rear elevations of the existing roof plus all associated site works. / 0.0 km away / 24 October 2019Granted
- SD24B/0551WAttic conversion to include the reconfiguration of the side roof profile from hipped to Dutch half hipped and to include a dormer window structure within the front roof slope and rear roof slope, and rooflights within the front roof slope / 0.0 km away / 30 January 2025Granted