Townland of Collegeland, Baldonnell Business Park, Dublin 22
Planning application SD23A/0141
DecisionGrant permission
Decided14 December 2023
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by South Dublin County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for South Dublin has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Townland of Collegeland, Baldonnell Business Park, Dublin 22?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.Source documents
Original council portal records and source PDFs where available.Included in site brief
1 council document — in the €39 site risk brief
Site brief
Nearby precedent
Similar nearby applications linked to this planning decision.- SD22A/0453Amend previously permitted application Ref. SD21A/0230 consisting of the installation of two external water tanks and associated concrete slabs, guardrails and access ladders, to the north-east of Units F & G (currently under construction) and all associated landscaping, infrastructure and site development works to facilitate the development. / 0.0 km away / 07 February 2023Granted
- SD25A/0122WWe DSV Solutions Limited intend to apply for planning permission for the inclusion of a new rear elevation canopy to the existing warehouse facility located at Unit F, Mountpark Baldonnell, Baldonnell Business Park, Dublin 22 as follows: Addition of a canopy structure (157m2, 7,42m high) attached to the rear of existing warehouse unit plus directly associated elevational changes and site works. / 0.1 km away / 21 July 2025Granted
- SD23A/0196Installation of 2No. external non-illuminated lettered signs to the eastern and northern elevations at Unit F, Mountpark Baldonnell. / 0.1 km away / 09 October 2023Granted
- SD23A/0307Installation of 1 no. external permanent site back up generator to the north of the site. / 0.1 km away / 19 January 2024Granted
- SD23A/0099Installation of 1 no. external air handling unit and associated ductwork to existing Unit F. / 0.1 km away / 01 September 2023Granted
- SD12B/0311Erect a single storey detached garage, tool store and boiler house together with associated site works. / 0.2 km away / 18 February 2013Granted
- S01A/0089Two dwellings with access from the new access road at Mill Road on 0.43 acre site. / 0.4 km away / 12 April 2001Granted
- SHD3ABP-312501-22Demolition of existing single storey dwelling and the construction of 274 units on a 4.62 ha (net) site (density 60 units per hectare). It will comprise of 51 houses, 38 duplex units and 185 apartments. The height of the proposed scheme will range from two storey houses and three storey duplexes to 5 storey and part 8 storey apartment blocks. The proposed residential mix will comprise of: 17 2-bed houses, 27 3-bed houses and 7 4-bed houses, 2 1-bed duplex, 17 2-bed duplex and 19 3-bed duplex units, 62 1-bed apartments, 119 2-bed apartments and 4 3-bed apartments. A 4-classroom crèche of c. 276 sq.m and 2 substations are also included in the proposed development. 276 car parking spaces and 634 bicycle spaces are provided. A planted woodland berm will be developed along the northern boundary with the N7 to provide a sound barrier and amenity open space. There are a number of green spaces located in the centre of the site and on the south east and west of the site with natural play and SUDS elements as well as a large open communal space for the two apartment blocks to the south. Vehicle, pedestrian and cycle access to the site will be from the Mill Road. A new road will be constructed running east west at the southern boundary of the site. The residential element of the site will have two access points off the proposed new road. This new route will extend eastwards to provide cycling and pedestrian connections through neighbouring Citywest lands and to the Saggart LUAS light rail terminus. Secondary access is proposed at the north west of the site from an existing access road connecting to Mill Road. This access is designed as services and emergency only and will be controlled by collapsible bollards. / 0.4 km away / 02 August 2022Granted