SD25A/0011W: The proposed development will consist of: Reconfiguration of the layout of Unit 5 resulting a slight decrease in the total GFA from 13,348 sqm to 12,650 sqm. The warehouse floor area of the unit will increase from 11,137 sq.m to 11,509 sq.m GFA and the associated office space will decrease from 1,689 sq.m to 994 sq.m; Reconfiguration of the service yard area including: Decreasing the service yard area to the north and west of the Unit 5 building; Relocation/reconfiguration of the service yard entrance; Omission of the permitted outbuildings in the service yard; Provision of updated landscaping with attenuation pond to the north of the building and service yard; Amendments to the western elevation to accommodate the changes to the layout of the unit; Reconfiguration of the bicycle parking area resulting in a reduction from 70 no. spaces to 64 no. spaces; Omission of the permitted tenant signage to Unit 5 and; All associated site development works.
Site within The Townland of Gollierstown, West of Grange Castle Business Park and Adamstown Road R120, Newcastle, Co. Dublin
DecisionGrant permission
Decided20 March 2025
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for South Dublin has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- SD25A/0298WThe proposals will comprise of amendments to Unit 7 (K78 V6TY) constructed under Reg. Ref.: SD23A/0301 (as amended by Reg. Ref.: SD24A/0224W and SD25A/0011W). The proposed amendments will consist of: • Change of use from logistics/warehousing to logistics/warehousing/light - industry to accommodate a manufacturing use; • Reconfiguration of the layout of the unit resulting a slight increase in the total GFA from 12,650 sqm to 13,333 sqm. The warehouse floor area of the unit will decrease from 11,509 sqm GFA to 10,652 sqm of manufacturing floor area for the new use and the associated office space will increase from 994 sqm to 2,518 sqm; • Amendments to the elevations to accommodate the changes to the layout of the unit; • Provision of a canopy at the entrance of the building on the southern elevation and a new outdoor terrace (c. 110 sqm) to the south of the unit; • Reconfiguration of the car parking spaces to the south of the unit and provision of a new overflow car parking area to the west of the service yard; • A total of 213 no. car parking space will be provided to serve the development; • New entrance to overflow car park from internal link road to the south; • Provision of 10 no. van spaces to the south west corner of the service yard; • Installation of a containerised generator within the service yard area; • Provision of new tenant signage on south elevation: • Relocation of existing signage on the south elevation to the east elevation; • Provision of carpark totem to overflow parking; • Provision of additional PV panels at roof level and; • All associated site development works and landscaping works / 0.0 km away / 04 February 2026Granted
- SD23A/0301The proposed development will consist of: The construction of five logistics / warehousing units (Units 1 - 5) with associated office accommodation, service yards, ancillary structures/areas, and substations. The overall floor area of the proposed logistics / warehousing units is c. 56,932 sq.m (Gross Internal Area (GIA)) with a total of c. 4,336 sq.m of office space. See following breakdown of each unit: Unit 1 will comprise GIA c. 10,432 sq.m (including c. 579 sq.m of associated office space) and measures c. 17.9m from finished floor level (FFL) to roof ridge; Unit 2 will comprise GIA c. 18,065 sq.m (including c. 1,005 sq.m of associated office space) and measures c. 18.4m from FFL to roof ridge; Unit 3 will comprise GIA c. 6,325 sq.m (including c. 579 sq.m of associated office space) and measure c. 17.4m from FFL to roof ridge; Unit 4 will comprise GIA c. 8,762 sq.m (including c. 484 sq.m of associated office space) and measures c. 17.6m from FFL to roof ridge; Unit 5 will comprise GIA c. 13,348 sq.m (including c. 1,689 sqm of associated office space) and measures c. 17.8m from FFL to roof ridge; Access to the site will be from the existing roundabout to the south of the site; Provision of no. 419 car parking spaces and 172 bicycle spaces to serve the proposed development; Associated works for the diversion of the existing foul sewer within the site; The provision of attenuation basins / wetlands across the site; Associated works for re-routing of the existing ESB overhead wires which traverse the site to underground cables within the site; The formation of plateaus on the site with surplus excavated material to allow for the future Phase 2 development and; All ancillary landscaping, boundary treatments, internal roads and roundabout, cycle / pedestrian paths, associated infrastructure, and site development works to support the development / 0.4 km away / 15 January 2024Granted
- SD24A/0224WThe proposals will comprise of amendments to Units 2, 3 and 4, permitted under Reg. Ref.: SD23A/0301. The proposed development will consist of: Unit 2 Reconfiguration of permitted substation; Reconfiguration of car parking layout; Unit 3 Reconfiguration of the layout of the unit resulting in a reduction of floor area from 6,325 sq.m GFA (including 579 sq.m of associated office space) to 4,386 sq.m GFA(including 831 sq.m of associated office space); Reconfiguration of the car park area to provide an increase in the total number of car parking spaces from 50 no. spaces to 68 no. spaces including 14 EV charging spaces. Reconfiguration of the service yard area including: Increasing the service yard area to the east of the Unit 3 building. Relocation of the service yard entrance from east side of plot to south side of plot; Provision of 132 no. delivery van spaces with EV charging for all van spaces. Relocation of external facilities including bin store, water tank, condensers and PV battery area. Relocation of the bicycle parking area and a reduction from 32 no. spaces to 22 no. spaces; The unit will be served by 2 no. dock level loading bays and 1 no. level access loading bay; Amendments to the elevations to accommodate the changes to the layout of the unit and the provision of signage on the elevations; Omission of internal roundabout and revisions to the internal road layout; Provision of a new pedestrian crossing; Relocation of permitted substation; Amendments to the permitted attenuation ponds; Omission of the permitted fire tender access along the western boundary of the plot and; Increase in unit's finished floor level from 67.800m to 68.200m Unit 4 Relocation of permitted substation; Reconfiguration of carpark and bike parking layout (no change to permitted number of parking spaces). All associated infrastructure, road markings, totem signs, signage, Corten wayfinding, boundary treatments, landscaping and site development works. / 0.7 km away / 27 January 2025Granted
- SD03A/0899Retention of (i) the conversion of 8 no. approved golf driving range bays to 4 no. golf centre stores (total floor area c210sq.m.). (ii) minor internal alterations and front elevational changes to approved golf centre building, and (iii) a replacement machine mowers store (c 55sq.m.); and permission for the change of use of approved machine mowers store to golf tuition suite (c. 63sq.m.) all on a 0.1 hectare site. / 0.7 km away / 24 March 2004Granted
- SD05A/0865The proposed development is consequent to the earlier grant of outline permission Ref: SD04A/0738 and will consist of a proposed two-storey four bedroom detached dwelling with garage and associated site works; the application also includes for the partial re-alignment of the access road to Newcastle Golf Course and the previously approved 'Septech' 2000 domestic waste water treatment system. / 0.8 km away / 13 December 2005Granted
- SD04A/0738For a two-storey four bedroom detached dwelling (c. 200 sq.m) and garage, a Septech 2000 domestic waste water treatment system, partial re-alignment of access road to Newcastle golf centre, landscaping and all ancillary site development works all on a 0.3 hectare site. / 0.8 km away / 14 February 2005Granted
- SD04A/0739For a two-storey four bedroom detached dwelling (c. 200 sq.m) and garage, a Septech 2000 domestic waste water treatment system, partial re-alignment of access road to Newcastle golf centre, landscaping and all ancillary site development works all on a 0.3 hectare site. / 0.8 km away / 15 February 2005Granted
- SD24A/0087WThe proposed development includes the construction of: 6 no. Stage buildings (buildings 1,2,3,11,13 &14) ranging in height between c. 20m and c. 23 m and comprising 11 no. Internal sound stages with overhead catwalks and 2-storey ancillary production offices including office space, plant and switch rooms, toilets, ICT rooms, staff toilets and showers and rooftop plant (totalling c. 35,187 sq. m); 4 no. workshops (buildings 15,16,17 &18) ranging in height between c. 9m and c. 10.5 m and comprising internal workshop areas, staff toilets and showers, ICT, plant and switch rooms(totalling c. 18,244 sq. m); TV studio and reception (building 4) comprising 3 no. TV studios (c. 17.8m height) and various supporting spaces across 3 floors including backstage shooting area, green rooms, hair and makeup rooms, production suites with ancillary offices, wardrobe, laundry room, Technical support offices, vision dept, lighting dept, pro service, run and crew kit room, chief engineer office, studio manager office, scenic store, props store, cameras and grip room, lighting and electrical room, plant room, sound control rooms, vision rooms, recording rooms and toilets at ground floor level; standard dressing rooms, tv post production spaces, kitchen and crew area, toilets, mechanical/electrical room, technical offices, media store at first floor level; star dressing rooms, tv post production, lounge and kitchen and toilets at second floor level; Single storey reception building to include guest holding areas, VIP and Guest service, security offices, staff toilets, showers and locker rooms (c. 10,875sq. m); 2-storey Dining Hall with ancillary 100 seat theatre (building 6) comprising indoor and outdoor dining areas, kitchen, storage and mechanical rooms, toilets and 3 no. meeting rooms at ground floor level; office space and covered outdoor balconies at First floor level (c. 4,351sq. m) Standalone café (building 5) (c. 96 sq. m) 3 no. single storey production suites (buildings 7,8 & 9) comprising offices, conference room, kitchenette, communal areas and toilets (totalling c. 795 sq. m); 3-storey car parking deck (building 19) (c. 14,782.sq.m) to include 438 no car parking spaces ( including 100 no. EV and 27 no. disabled) with ancillary offices (building 20) (c. 4,307sq.m) refuse recycling area and rooftop plant; and Outdoor stage area associated with the TV Studio and Reception Building; Site landscaping to include: an amenity walkway and biodiversity area along the northern boundary of the site; public realm and planting areas in the vicinity of TV Studio and Reception Building and production suite offices; green roofs; and boundary treatments. Hard standing to include backlot area (c. 14,160 sq.m) and 'shooting lanes' (c.18,900 sq.m) to facilitate outdoor filming; Electrical Substation (c 236 sq. m); primary and secondary gate houses (buildings 10 & 12) (c. 19 sq. m each) The proposed development will include the provision of 516 no. surface car parking spaces (including 96no. EV, 13 no. disabled and 13 no. EV / disabled ); Basecamp area to provide 36 no. Large Vehicle parking spaces & 3 no. bus parking spaces to front of reception building as well as provision of Bicycle parking to include 274 no. covered spaces and 96 no. external spaces. Additional works to include removal of existing wall and vegetation at south western boundary; provision of bin store adjacent to the proposed backlot area and additional waste storage area adjacent to proposed dining hall; proposed pump station; rooftop PV panels (Buildings 17 & 18);rooftop plant; Building signage; LED video screen on eastern elevation of TV studio and reception building; public lighting; drainage and services provision; boundary treatments (including security fencing); piped site wide services; pedestrian and cycle links and all ancillary works and services necessary to facilitate construction and operation. The primary proposed vehicular, cyclist and pedestrian entrance from the newly constructed Grange Castle West Access Road will be located at the eastern boundary of the site with a secondary vehicular access at the southeastern corner of the site. / 0.8 km away / 19 December 2024Granted