GrantedDecided 12 August 2021South Dublin County Council

SDZ20A/0021: 10 year permission for roads and drainage infrastructure works as approved under the Clonburris Strategic Development Zone Planning Scheme (2019) to form part of the public roads and drainage networks providing access and services for the future development of the southern half of the overall Strategic Development Zone (SDZ) lands; the roads infrastructure works are for the construction of c. 4.0km of a new road, known as Clonburris Southern Link Street, generally consisting of 7m wide single carriageway, plus on either side of the carriageway landscaped verges, 1.75m wide off-road cycle tracks and 2m wide footpath including public lighting, trees, 288 on-street car parking spaces (including 26 disabled parking spaces), pedestrian crossings, bus stops, a number of vehicular access spurs to facilitate future development of adjoining lands, a total of 8 new junctions (including 3 junctions to facilitate future road developments within the SDZ; 2 junctions with proposed local access roads and 3 new junctions with Hayden's Lane, Lynch's Lane and Ninth Lock Road) and alterations to 4 existing junctions on Newcastle Road (R120), Grange Castle Road (R136), Fonthill Road (R113) and also to the existing access road to Park and Ride facilities at both Kishoge Station and at Fonthill Station; alterations to the existing public roads Newcastle Road (R120), Hayden's Lane Access Road, Hayden's Lane, Lynch's Lane, Grange Castle Road (R136), Fonthill Road (R113) and Ninth Lock Road arising from new junctions with the Clonburris Southern Link Street consisting of reconfiguration of a c.165m long section of Newcastle Road (R120) including road widening and revisions to layout of junction with Hayden's Lane Access Road; incorporation of Hayden's Lane Access Road into proposed Clonburris Southern Link Street; provision of new junction with Hayden's Lane and Clonburris Southern Link Street; incorporation of a c. 26m long section of Lynch's Lane into proposed Southern Link Street and provision of a new junction with Clonburris Southern Link Street; reconfiguration of a c. 260m long section of Grange Castle Road, including road widening and replacement of existing roundabout with signalised junction; reconfiguration of a c. 250m long section of Fonthill Road, including road widening and replacement of existing roundabout with signalised junction; reconfiguration of a c.125m long section on Ninth Lock Road including road widening and provision of a new junction with Clonburris Southern Link Street; construction of 2 local access roads, consisting of c. 110m long road extending north from Clonburris Southern Link Street and providing access to proposed foul pumping station and generally consisting of a 6m wide single carriageway plus on either side of the carriageway 2m wide footpath including public lighting, 2 set-down parking spaces and vehicular access to proposed foul water pumping station; north/south Link Street (c. 240m in length) extending north from southern Link Street to the Kildare-Cork railway line and generally consisting of a 7m wide single carriageway plus on either side of the carriageway 1.3m wide landscaped verge, 1.75m wide off-road cycle lane, 2m wide footpath including public lighting and 2 vehicular access spurs to facilitate future development of adjoining lands; the drainage infrastructure works include 8 attenuation systems (with outfalls to Griffeen River, Kilmahuddrick Stream and existing storm sewers) including 4 ponds, 2 modular underground storage systems and 2 detention basins combined with modular underground storage systems all adjacent to proposed Clonburris Southern Link Street; surface water drainage culverts to existing watercourses; flood water compensation area adjacent to Griffeen River; surface water drainage and water supply trunk infrastructure within proposed road corridors; wastewater infrastructure including a foul pumping station and pipe network within proposed road corridors to facilitate drainage connections to future wastewater drainage infrastructure within the adjoining SDZ lands (including future Irish Water pumping station) and to connect to the existing sewer network in Cappaghmore housing estate; ducting for public electrical services and utilities and the diversion of existing utilities is provided for within the proposed road corridor; Permission is also sought for all ancillary site and development and landscape works associated with the development including hard and soft landscaping, boundary treatments, road markings and signage, enabling works and temporary construction works (including site accommodation, site compounds and temporary boundary fencing); the application is made in accordance with Clonburris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clonburris Strategic Development Zone Planning Scheme Area as defined by Statutory Instrument No. 604 of 2015; an Environmental Impact Assessment Report accompanies the application.

In the townlands of Adamstown, Grange, Kishoge, Clonburris Litte & Cappagh, Co. Dublin
DecisionGrant permission
Decided12 August 2021
Application typeSDZ Application
Source documents1

Site

What is on file

0refusal reasons0conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for South Dublin has not started yet.

Conditions

No conditions

No conditions are on record for this application yet.

Source documents

Original council portal records and source PDFs where available.

Nearby precedent