Within the townlands of Kishoge, Balgaddy, Neillstown and Cappagh, Clondalkin & Lucan, Dublin 22
Planning application SDZ24A/0033W
DecisionGrant permission
Decided10 February 2025
Application typeSDZ Application Clonburris
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by South Dublin County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for South Dublin has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Within the townlands of Kishoge, Balgaddy, Neillstown and Cappagh, Clondalkin & Lucan, Dublin 22?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.Source documents
Original council portal records and source PDFs where available.Included in site brief
1 council document — in the €39 site risk brief
Site brief
Nearby precedent
Similar nearby applications linked to this planning decision.- SDZ22A/0011The proposed primary school will extend to c3,355sq.m will be 2 storeys in height and will comprise 16 no. classrooms with an additional 2 classroom Special Educational Needs Unit; a General Purpose Hall and all ancillary teacher and pupil amenities and facilities. The proposed development also provides for hard and soft play areas, including 2 no. outdoor ball courts, bicycle parking, staff car parking, vehicle drop off and set down areas. Photovoltaic Panels (PV) are proposed on roofs in addition to EV Charging Points and a packaged Biomass heating plant. The proposed development also provides for all landscaping and boundary treatments and all associated site development works. Access to the site will be via a new junction and access road off Thomas Omer Way. The new access road will run south off Thomas Omer Way and then west into the site. The proposed access road Is in accordance with the Clonburris Strategic Development Zone (SDZ) Planning Scheme and incorporates public lighting, footpaths and cycle tracks. A further pedestrian / cycle only connection to Thomas Omer Way ls also proposed along the western green corridor, west of the proposed school building. / 0.1 km away / 16 February 2023Granted
- SDZ24A/0032WThe development consists of the retention and completion of revisions to a section of the northern site boundary comprising the omission of the pedestrian/cycle access (consisting of ramp and stairs) off Thomas Omer Way and the repositioning of the pedestrian access c. 6 m in an easterly direction to co-join with the permitted vehicular access. The amendments do not involve any changes to the position of the permitted vehicular access itself and the access road remains in accordance with the Clonburris Strategic Development Zone (SDZ) Planning Scheme. Permission is also sought for the relocation of bicycle parking areas within the site; revisions to the permitted boundary treatment along a section of the eastern site boundary; the installation of 3 no. flagpoles in the south-eastern part of the site; and revisions to the site compound including repositioning of bin store area and replacement of previously permitted bio-mass heating with new heat pump and gas storage tank. / 0.1 km away / 11 March 2025Granted
- SD15A/0101Construction of a pre-fabricated, single storey extension to the existing school premises, consisting of 4 classrooms with communal corridor, an entrance lobby/link and Disabled WC. The conversion of one existing classroom to form 2 Special Educational Teacher Support Rooms. The provision of new external hard and soft play areas together with connections to the existing foul water drainage system and provision of onsite surface water disposal system, including all other ancillary and associated site works. / 0.3 km away / 27 July 2015Granted
- SD13A/0042Construction of 1 no. single storey temporary prefab school building. The school will comprise: 4 no. classrooms with ancillary office areas; playground area and boundary fencing; associated site works; 2 vehicle access points from Griffeen Avenue; on site parking spaces and drop off area on site between Tor an Ri Court and Meile an Ri Green. Significant Additional Information (revised location description) - between Lynch's Lane & Tor an Ri Walk. / 0.3 km away / 04 June 2013Granted
- S02A/01503 bedroomed detached house on land to the side. / 0.3 km away / 26 April 2002Granted
- SD20A/01092 storey modular classroom building and a single storey toilet building, steel framed covered walkway structure linking to the existing school, relocation of existing bicycle shelters and all associated site development works. / 0.3 km away / 16 July 2020Granted
- SD23A/0249Remove section of existing grass margin and replace with a concrete apron, install accessible kerb and erect a proposed new stainless steel and glass bus shelter, 5.2m x 1.85m x 2.8m high on the public footpath 21.0 metres east of existing bus stop pole with 2 no. LED illuminated advertising panels each of 2.0 square metre area. / 0.3 km away / 21 November 2023Granted
- SD03A/0968Retention of Change of Use from Private Residential use to part Residential and part Playschool / Afterschool care / 0.3 km away / 24 February 2004Granted