Ballydine, Kilsheelan, Clonmel
Planning application 18600616
DecisionConditional grant
Decided03 October 2018
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Tipperary County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Tipperary has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Ballydine, Kilsheelan, Clonmel?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 20966The agricultural entrance and roadway and PLANNING PERMISSION to complete the agricultural entrance and roadway with all associated site works to my agricultural lands / 0.1 km away / 26 April 2021Granted
- 18600120An existing wheelwash, weighbridge, office and hardcore area for an indefinite period / 0.4 km away / 28 March 2018Granted
- 211365Development on this site of circa c.7.48 hectares. The development will consist of a 10-year permission for the construction of a Solar PV Energy Development comprising installation of Solar Photovoltaic (PV) panels on ground mounted frames/support structures within existing field boundaries, underground cabling and ducting, 1 no. customer control building, 1 no. switchgear and transformer building, site perimeter (stock proof) security fence and associated access gates, maintenance track, landscaping and all associated site development works. A temporary construction compound will be provided and vehicular access is via the existing access route from N24 serving the Ballydine 110kv substation to south-west of the site. This application relates to development for the purposes of an acitivity requiring a licence under the Industrial Emissions Directive. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application. / 0.4 km away / 02 February 2022Granted
- 21407Construction of a proposed three-storey pilot plant manufacturing facility sized approximately 3,266 square metres and approximately 20.75 metres high and located and linked to the existing factory 03 manufacturing building and located south of the O.S.D. manufacturing facility, currently under construction (ref. 20/693). The project development alos includes the following: a) An equipment yard housing plant, equipment and abatement system, vents and equipment housings including a covered waste tank, b) Roof mounted equipment and vents, c) Modifications to existing underground utilities including a surface water attenuation tank, underground storage tanks and miscellaneous works, d) The extension of the temporary contractors’ compound, currently under construction and additional local temporary contractor parking together with a second compound directly adjacent to the proposed facility, e) Revised landscaping and site-works, f) Modifications to the existing internal roads layouts, site lighting, pipe bridges, links, bunded tanks and supporting structures, and a truck staging area, g) Modifications to the existing car park layout to allow for the inclusion of additional accessible car parking spaces and electrical charge points, h) Alterations to the elevations of Factory 03 to accommodate the proposed development. This application consists of a development for an activity for which a licence under Part IV of the Environmental Protection Agency Act 1992 (as amended by the Protection of the Environment Act 2003) is required. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) accompany this planning application. This is a site to which the Chemicals Act (Control of Major Accident Hazards involving dangerous Substances) Regulations 2015 (S.I. 209 of 2015) applies / 0.6 km away / 04 August 2021Granted
- 19601130(i) change the design of the proposed dwelling and location of the proposed dwelling within the site as granted under Planning Reference Number 18601236 and (ii) change the use of the existing fire damaged dwelling to a domestic garage and carry out all necessary repair works to same to enable its use as a domestic garage and all associated site development works / 0.6 km away / 05 December 2019Granted
- 2561347The construction of (i) an extension to loose shed with cubicle and slatted tank and storage area, (ii) soiled water tank and all associated site works / 0.6 km away / 19 February 2026Granted
- 25185The construction of (i) milking parlour incorporating dairy plant rooms, meal bin, holding yard with crush/drafting yard, underground effluent tank with flow channel (ii) extension to shed to add cubicle shed with underground effluent tank and all assorted site works. Demolition is also required for 3 loose sheds and derelict dwelling / 0.6 km away / 13 October 2025Granted
- 20188Construction of (i) milking parlour incorporating dairy plant rooms, meal bin, holding yard with crush/drafting yard, underground effluent tank with flow channel (ii) extension to shed to add cubicle shed with underground effluent tank and all assorted site works. Demolition is also required for 3 loose sheds and derelict dwelling / 0.6 km away / 08 July 2020Granted