The Glebe, Raheen Road Old Bridge, Clonmel
Planning application 201521
DecisionConditional grant
Decided16 February 2021
Application typeRETENTION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Tipperary County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Tipperary has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near The Glebe, Raheen Road Old Bridge, Clonmel?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 20597Construction of a 2.4m high powdercoated mesh fence and gates to enclose the existing ballcourt / 0.2 km away / 24 July 2020Granted
- 2460151The demolition of the existing dwelling, garage and shed and the construction of a new single-storey dwelling, detached home office/store, modify roadside boundary and all associated site development works / 0.2 km away / 24 February 2025Granted
- 1751To construct an All Weather Pitch, including fencing and lighting and including excavation, filling and regrading and spreading of excavated material on Site. A substantial part of the Proposed Development will be in Co. Tipperary and a separate application has been made to Tipperary County Council / 0.2 km away / 21 March 2017Granted
- 17600144Construction of a commercial extension and partially reconstruct the existing building including all associated site development works / 0.2 km away / 21 June 2017Granted
- 211464A material change of use from public house and lounge to dental surgery at ground floor level with all associated elevation alterations and erection of signage to front facade / 0.2 km away / 24 November 2021Granted
- 17601319The change of use from office to educational/training with ancillary office use for the first, second and third floor / 0.2 km away / 02 February 2018Granted
- 2460542The change of use of part of the ground floor office building into a Rehab Day Care Centre which includes the reconfiguration of the internal layout, replacement of external windows and all associated site works and services / 0.2 km away / 23 August 2024Granted
- 2560380A four-bedroom detached dwelling, new vehicular access from Glenegad Road, off-street parking, connection to public services and all associated site works / 0.3 km away / 03 November 2025Granted