Willisson, Roscrea, Co. Tipperary
Planning application 20457
DecisionConditional grant
Decided08 July 2020
Application typeRETENTION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Tipperary County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Tipperary has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Willisson, Roscrea, Co. Tipperary?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2560942Upgrades to the existing Roscrea WwTP and storm management system to comprise of the construction of a new inlet chamber (5.2m x 2.5m) and associated ducting, cable draw pits, control panels, realignment of existing boundary wall ground works and the provision of a PV Solar Array (36m2) on the existing sludge dewatering house, all at the existing Roscrea WwTP; decommissioning of 2 no. existing pipe bridges and construction of 4 no. pipe bridges (450mm diameter) across the River Bunow, construction of a retaining wall and ancillary works at Beechwalk; the decommissioning of an existing pipe and the construction of a gravity sewer at Beechwalk (66m); the decommissioning of the Storm Water Overflow, reuse of an existing pipe (14m) and the construction of a gravity sewer (205m) between Beechwalk and Cois Aglish connecting to the existing network; creation of a temporary entrance off the R491 to facilitate access to the proposed temporary construction compound adjacent to the existing Roscrea WwTP and all ancillary and associated temporary works to facilitate the development at the construction stage - A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application / 0.5 km away / 09 March 2026Granted
- 211825Erection of 2,120.00 m2 or 363.60 kWp of photovoltaic panels on the roofs of building, Roscrea Cold Storage, with all associated site works / 0.6 km away / 15 February 2022Granted
- 211823Erection of 2250.00 m2 or 380.25 kWp of photovoltaic panels on the roofs of building, Roscrea Cold Storage, with all associated site works / 0.6 km away / 15 February 2022Granted
- 2260099Extension to side of existing house with new Wastewater Treatment System and Tertiary Filter and all associated site works / 0.7 km away / 25 April 2022Granted
- 19600380(1) Cold store building extensions, and including associated offices, canteen, toilets, front and rear loading bays internal & external plant areas (2) revisions to site boundaries and all ancillary works / 0.7 km away / 11 June 2020Granted
- 217271) single story 3 bay extension to the production area, 2) single story extension to existing storage and dispatch facilities including 3 loading bays for large trucks and 3 van loading bays complete with disabled toilet, 3) new entrance and use of existing entrance as exit and site improvements including concrete area for washing vehicles and PERMISSION for RETENTION of 4) office entrance permanently and 5) plant room at rear of factory permanently / 0.7 km away / 27 October 2021Granted
- 22372Shower toilet and kitchen as part of office suite / 0.7 km away / 13 July 2022Granted
- 222311) changes to building made since grant of planning permissions in 2001, including additional mezzanine floor area and external maintenance access stair, change of use of part of 1st floor to use as an apartment, change in position of No. 2 stairs and associated entrance door, 2) Retention of plant and tanks installed outside, ESB sub station, third tall silo, gas tanks, milk tanks, water chiller, diesel tank and pressure washer and 3) PERMISSION to erect new external stair from apartment / 0.7 km away / 06 May 2022Granted