Main Street, Templemore, Co. Tipperary
Planning application 20613
DecisionConditional grant
Decided31 August 2020
Application typeRETENTION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Tipperary County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Tipperary has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Main Street, Templemore, Co. Tipperary?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 22585The installation and erection of a 11.4kw PV solar panel system and associated site works to the rear south facing external roof / 0.0 km away / 23 November 2022Granted
- 2360990The change of use of an existing vacant ground floor retail unit to licensed betting office, to include for demolition to parts of the existing structure to the rear, new ground floor extension, internal renovations to 1st floor level accommodation to include the provision of new stairs to rear and to include for all new signage and associated site works / 0.0 km away / 07 August 2024Granted
- 2311The change of use of existing disused public house to creche on the ground floor and from residential to creche on the first and second floors to include the following: (A). Demolition/removal of existing internal walls, external fire escape stairs, walls and roof from existing sheds, existing flat roof to rear (B). Construction of extension to rear to provide proposed fire escape stairs & lift (C). Construction of new internal walls (D). Change of use of existing shed 1 to staff area (E). Change of use of existing shed 2 to toddler/sleeping area (F). Change of use of existing shed 3 to after school recreational area (G). Construction of extension to link existing building to shed 2 (H). Block up existing door way and create new door opening on east elevation (I). Erect proposed signage and all associated site works / 0.1 km away / 28 July 2023Granted
- 2260277The following works: a) demolition of the existing 2-storey extension to the rear of the existing dwelling; b) construction of a new single storey extension to the rear of the existing dwelling; c) associated alterations to existing dwelling external elevations to accommodate proposed new extension & internal layout; d) all associated site works. The above works are proposed to be carried out to a Protected Structure, reference: TMS28 / 0.1 km away / 03 October 2022Granted
- 2260310Change of use of the ground floor from retail to residential together with associated works / 0.1 km away / 16 August 2022Granted
- 2560802The following unauthorised development:- 1) partial change of use from bank to gym / wellbeing hub, 2) alteration to existing building, including internal alterations, and forming door at east gable of main house to form an access door off shared laneway, 3) installation of modular building to rear yard, 4) erection of lightweight fencing to separate rear yard from garden area, 5) replacement of rear fire exit door and 7 no. rear windows and 6) signage and associated works / 0.1 km away / 16 February 2026Granted
- 17600983Changes to front elevation of property to include a new shop front and associated site works / 0.1 km away / 25 October 2017Granted
- 2460412Installation of an external access stairs to the rear of property including all associated site works / 0.1 km away / 06 September 2024Granted