Fennor, Urlingford, Thurles
Planning application 20909
DecisionConditional grant
Decided06 October 2020
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Tipperary County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Tipperary has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Fennor, Urlingford, Thurles?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 23181The development of a cattle house incorporating slatted tank with slats laid on / 0.3 km away / 03 November 2023Granted
- 211198A two storey dwelling, domestic garage, entrance, install waste water treatment system including associated site works / 0.5 km away / 24 March 2022Granted
- 17600429Single storey dwelling house with habitable attic accommodation, new road entrance, domestic effluent treatment system, garage, boundary treatment, landscaping and site development works / 0.5 km away / 12 June 2017Granted
- 19600138Construction of dwelling house, domestic garage, entrance, driveway, septic tank and percolation area and all associated site works / 0.6 km away / 08 April 2019Granted
- 17600706Building a dwelling, domestic garage, entrance, install septic tank, including associated site works / 0.6 km away / 12 October 2017Granted
- 19332Of Planning Permission Reference 14/178 / 1.1 km away / 08 July 2019Granted
- 20685For a mixed-use development consisting of A/ the completion of the existing Togher Way residential development at Togher Way, Urlingford, Co Kilkenny to include for the provision of 23 new houses consisting of 3 no. single storey detached house 2-bed dwellings, 10 no. two storey semi-detached 3 bed dwellings, 3 no. two storey detached house 4-bed dwellings, 7 no. two storey and a half detached house 4-bed dwellings, open spaces and active recreational areas, playgrounds with associated fences and gates, carpark spaces, visitor carpark spaces (8), B/ the extension to Urlingford Business Park, Main Street, Urlingford, Co Kilkenny, with development to consist of 1 no. reception pavilion (51.8 sq.m), 3 no. two storey office buildings with own door office suites (266 sq.m each), 8 no. two storey light industrial warehousing units (493.6 sq.m. each), bicycle spaces (56) and car park spaces (150), all with the provision of new roads and footpaths, public lighting, importation of fill material (circa 25k cu.m.) to facilitate adjustments to existing ground levels, boundary walls, gates, new site boundary fences and walls, fascia signage, 1 totem signage, 2 no. ESB substations, drainage, flood compensation area, 6 no. stormwater attenuation tanks with associated flow controls and separators, 1 no. Stormwater pump station, 1 no. foul pumping station compound and proposed rising mains at Togher Road, Urlingford, Co Kilkenny towards Urlingford Town Centre system, landscaping and all associated site and other works / 1.1 km away / 05 November 2021Granted
- 17155For the construction of two number semi detached dwellings, connection to existing watermains, public foul and stormwater sewers with all associated site development works / 1.2 km away / 15 June 2017Granted