Monaincha, Roscrea, Co. Tipperary
Planning application 211102
DecisionConditional grant
Decided16 September 2021
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Tipperary County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Tipperary has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Monaincha, Roscrea, Co. Tipperary?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2360358Development in peatland consisting of an access track measuring approximately 4.00m wide and 1.20km in overall length and concrete hardstanding measuring approx 97.00m in length and 26.00m in width (approximately 2,500sqm in overall area) / 0.3 km away / 17 July 2023Granted
- 2360677The installation of a 34.11hectare/84.28 acre solar farm at lands known as Brehony's Bog, within the townland of Monaincha, Roscrea, Co. Tipperary (E: 616980, N: 687790 (ITM)). The solar farm will consist of a series solar photovoltaic (PV) panels mounted on steel support structures and will measure 2.00m in overall height. Ancillary development to the installation of solar PV panels includes 12no. transformers; 106no. pole-mounted CCTV cameras measuring 2.75m high; underground cabling; 3.80km (approx.) of fenceline measuring 2.00m at highest point; creation of new graded internal access tracks approximately 4.00m wide from two existing gated entrances on northern site boundary, each measuring 6.50m wide. A temporary compound measuring 5,000sqm will be established during the construction phase of the solar farm, whereupon the area will then be used for the siting of solar PV panels following the construction phase. The proposed solar farm will operate over a 40-year period, after which it will be decommissioned, with all associated lands returned to their original use. A Natura Impact Statement (NIS) has been prepared and submitted in support of this planning application / 0.4 km away / 17 April 2024Granted
- 2560679The extension to side of existing house, permission to renovate and extend derelict cottage on site, and permission to form new entrance to site and all associated site works / 1.7 km away / 20 February 2026Granted
- 2460549The conversion of attic space to habitable rooms including bedrooms and home office with gable windows and roof lights to rear and all associated site works / 1.7 km away / 16 August 2024Granted
- 2310Amendment to the design of the previously approved development (Planning Reference: Tipperary County Council (16/600917) and An Bord Pleanála (Pl92.249060), which comprises consent for a Solar PV Energy Development and for planning permission for a proposed Battery Energy storage system - amendments include; (1) changes to the configuration of the Solar PV rows, (2) a reduction in the height of the solar PV panels, (3) reduction in the spacing of Solar PV rows (strings), (4) increase in size of solar panels, (5) increase in solar panel output resulting in an overall increase in solar power generation, (6) a change in solar panels tilt (degree), (7) an increase in the number of transformers/inverters, (8) an increase in the area of the individual transformers, (9) an increase in the number of panels, (10) the introduction of a Battery Energy Storage system with a compound size of 5,400 square metres containing 60 battery units and 30 inverter units, all of which measure 6.1 m in length, 2.45m in width and 2.9m in height, together with a switch room/SCADA room - A Natura Impact Statement will also be submitted with the application / 1.7 km away / 09 March 2023Granted
- 18600931Dwellinghouse, new entrance, septic tank with standard percolation area and all associated site works / 1.8 km away / 12 December 2018Granted
- 20686Extension to sides of existing house and all associated site works / 1.8 km away / 21 August 2020Granted
- 211779Existing side extension to dwelling / 1.8 km away / 07 February 2022Granted