Application description published by Tipperary County Council.
A ten-year permission of a wind farm project. The development will consist of: Construction of up to 7 no. wind turbines with a maximum overall tip height of 150m, comprising a tower of between 75-95m high, to which three blades of between 55-70m in length will be attached; Associated hard stand areas at each turbine; 1 no. 30m permanent meteorological mast and all associated infrastructure and works; 1 no. 38kV electrical substation and all associated infrastructure and works; 20kV underground cables facilitating the connection of turbines to 38kV electrical substation and all associated infrastructure and works; Circa 19km of 38kV underground cabling and all associated works along public roads to facilitate the connection of the proposed 38kV wind farm electrical substation to the existing 38/110kV Doon substation in the townland of Ballyvaughan; Provision of a new site entrance on the L2035; Upgrading of existing agricultural tracks and construction of new site tracks and all associated works as required; A temporary site compound and all associated works; Demolition of 2 no. derelict buildings; Provision of 2 no. cattle underpasses circa 400m and circa 580m to the east of the new site entrance; and all associated infrastructure and site development works. The proposed underground cabling works located within the public road corridor cross Protected Structure RPS S121 (Loughcapple Bridge). An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) have been prepared in respect of the proposed development and will be submitted with the application
Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.
ABP-315176-22Submitted 23 November 2022 / decided 01 December 2023
Status not recordedCONDITIONAL
Appeal submittedAppeal reference ABP-315176-22
23 November 2022
Appeal decisionCONDITIONAL
01 December 2023
No appeal document has been bound to this case yet; the timeline will enrich as indexing continues.
Decision details
Core application dates and identifiers from the public planning record.
Application ref
211502
Received
12 October 2021
Decided
27 October 2022
FI requested
Yes
Authority
Tipperary County Council
Application type
PERMISSION
Outcome
Conditional grant
Source status
Documents indexed. Reason extraction for Tipperary has not started yet.
Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.
Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Tipperary has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Knockroe Kilnagranagh Newtowndrangan Tullowcussaun Ballyvadlea Ballyhomuck Kilburry West Milestown Bannixtown Quartercross Clare More Killusty North Killusty South Kiltinan Loughcapple Grange Beg Miltown Britton Mullenranky Kilmore, Ballinvoher Redm?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.
Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.
Source documents
Original council portal records and source PDFs where available.
Included in site brief
1 council document — in the €39 site risk brief
Refusal reasoning quoted verbatim from the council decision file
Policy citations and the planner's own wording
Direct links to the source documents on the council portal