ESB's Thurles 110kV substation, Ballygemmane, Thurles Co. Tipperary
Planning application 21303
DecisionConditional grant
Decided12 August 2021
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Tipperary County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Tipperary has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near ESB's Thurles 110kV substation, Ballygemmane, Thurles Co. Tipperary?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 20771Construction of 1 no. A+-30 Mvar STATCOM transformer, 1 no. auxillary transformer, 3 no. reactors and 1 no. outdoor cooling bank, control and valve building (233m2), 1 harmonic filter, 1 HV circuit breaker (including CT and VT), 1 MV disconnector and earth switch, 2 no. cable sealing ends, 1 no. 110kV feeder bay, 1 busbar connection and underground connection to existing ESB Thurles 110 kV substation, security fencing, security gate, 7 no. 22m high lightning masts, permeable and non-permeable surfacing, additional internal access road, additional fencing to match existing 2.6 m high palisade and all other ancillary site development works and 2 temporary contractors compounds (the development is an extension to the existing substation and this extension has an overall site area (within the planning application boundary) of 1.839ha. In operation the STATCOM would be accessed through the existing gated entrance to the site via the local road to the immediate South. During construction, temporary access is proposed to the east of the existing substation. A Natural Impact Statement (NIS) has been prepared as part of this application) / 0.1 km away / 03 September 2020Granted
- 2560940A Battery Energy Storage System (BESS) development to consist of a new site entrance and access track, site security fencing including a noise acoustic barrier, access gates, BESS enclosures, a BESS intake substation, MV skid, a back-up generator, a monitoring house, an auxiliary transformer, spares containers, CCTV, an onsite toilet, carparking, a temporary construction stage compound area, landscaping and all associated ancillary development services and works, all to be provided within a total overall application boundary of 2.69 ha. Permission is sought for the proposed BESS development for a period of 10 years with an operational period of 40 years. An Appropriate Assessment Screening Report (AASR) and Natura Impact Statement (NIS) has been prepared for this development and submitted with this planning application. A separate application will be submitted to An Coimisiún Pleanála to obtain permission for a 110kV substation on site / 0.1 km away / Not recordedGranted
- 25600661) domestic garage/store, 2) sunroom to side of existing house, 3) conversion of existing domestic garage to a bedroom and ensuite including alterations to roof and front elevation, 4) additional window to side elevation and 5) all associated site works / 0.3 km away / 25 March 2025Granted
- 2260650A) construction of a new, part two-storey, part single-storey detached dwelling, b) new detached garage, c) new site access, d) new connections to existing utilities, e) new waste-water treatment system and percolation area and f) all associated site works / 0.5 km away / 16 August 2023Granted
- 21638Completion of partially constructed 15.3km long 38kV overhead electricity line from Thurles electricity substation to the Borrisoleigh electricity substation as permitted under TCC Reg 08/511136 which comprises an overhead line supported by a total of 116 structures - as this permission has expired, permission is sought for works not yet completed, namely 1) works to 38 no. structures to (subject to final detailed design) erect replacement wooden poleset structures or alter existing structures, 2) stringing of conductor along approx. 7 km of the overhead line, and 3) all ancillary works related to the project / 0.6 km away / 01 July 2021Granted
- 2460885The as-built changes to dwelling house previously granted planning permission (reference no. PLC/8809) including retention of existing sheds / 1.0 km away / 05 December 2024Granted
- 2460488Extension to existing house and all associated site works / 1.0 km away / 21 February 2025Granted
- 19601176(1) extension to rear of dwelling house, (2) a porch to the side of dwelling house (3) entrance gates and boundary walls, (4) a domestic garage and all associated works. Planning permission to upgrade the existing septic tank, to a new septic tank and percolation area and associated works / 1.2 km away / 09 December 2019Granted