GrantedDecided 10 August 2021Tipperary County Council

Tyone, Nenagh, Co. Tipperary

Planning application 21338
DecisionConditional grant
Decided10 August 2021
Application typePERMISSION
Source documents1

Site

What is on file

0refusal reasons0conditions8nearby records

Proposed development

Application description published by Tipperary County Council.
The construction of (1) a porch at the front entrance, (2) a canopy over side door at front, (3) a bay window to kitchen at ground floor to rear with balcony over, (4) replacement of window with door to side elevation, (5) replacement of first floor window with double doors onto balcony to rear elevation, (6) replacement of all uPVC windows to the front elevation with timber sliding sash windows, and (7) a storage shed within the farmyard of an existing dwelling - the proposed development is within the curtilage of a protected structure (No. 646 as identified in the North Tipperary County Register of Protected Structures)

Application and appeal history

Structured appeal stages, outcomes and source documents currently tied to this application.

No indexed appeal history

No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for Tipperary has not started yet.

Conditions

No conditions

No conditions are on record for this application yet.

Planning a project near Tyone, Nenagh, Co. Tipperary?

Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.
Get up to 80 detailed nearby comparables in a site risk brief →