Moorstown, Fethard, Co Tipperary
Planning application 22655
DecisionConditional grant
Decided26 January 2023
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Tipperary County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Tipperary has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Moorstown, Fethard, Co Tipperary?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 17600372An increased throughput of organic waste material at the existing Miltown Composting Ltd. facility. The proposed planning consists of an increased throughput which will also require a review of the facility's EPA Waste Licence (Reg. No. W0270-01). The application shall be accompanied by an Environmental Impact Statement / 0.1 km away / 19 December 2017Granted
- 2260121Reconstruction and extension of existing agricultural storage structure including use as organic material maturation and extension to existing storage facility, increase in allowed intake of organic material from 50,000 to 75,000 tonnes per annum to the processing facility, air handling bio-filter installation and associated extract and input fans, all necessary site works, an Environmental Impact Assessment (EIAR) will be submitted with the application to Tipperary Co. Co. with the planning application and the proposed development will require a review of the site’s EPA Industrial Emissions Licence (W0270-02) / 0.1 km away / 20 September 2022Granted
- 18600472Biofilter and associated extract and input fans to compost maturation shed with embankment screen. Roof watering harvesting storage tank. / 0.1 km away / 07 June 2018Granted
- 19600690Reconstruction of and extension to existing agricultural storage building and all necessary site works and services / 0.1 km away / 08 August 2019Granted
- 22393(A) alterations to elevations of the existing dwelling house and changes to the roof height at the rear of the dwelling from planning permission granted under P314448. (B) Retention permission to retain the construction of an extension to the rear of the dwelling. (C) Retention permission for the change of use of domestic garage to granny flat / 0.8 km away / 13 June 2023Granted
- 2560403Extension of an existing cattle shed and the construction of an underground slatted slurry storage tank in the existing cattle shed and proposed extension, together with any associated concrete yards and site works / 1.3 km away / 03 July 2025Granted
- 18601105Construction of a new single storey family house, wastewater treatment system, percolation area, site entrance together with all ancillary site works / 1.3 km away / 01 November 2018Granted
- 18600081The indefinite retention of as-constructed 4 box stables building with associated tack room / 1.5 km away / 12 December 2018Granted