Ballykisteen Hotel, Gotinstown, Limerick Junction
Planning application 23240
DecisionRefused
Decided03 November 2023
Application typeEXTENSION OF DURATION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Tipperary County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
Refusal reasons not machine-readable
Documents are indexed. Reason extraction for Tipperary has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Ballykisteen Hotel, Gotinstown, Limerick Junction?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 19601430The construction of a 43MW Solar PV development comprising of ca. 155,000 no. photovoltaic panels laid out in arrays, the construction of a 38 kV substation, (ca. 114.9m2 X 4.75m tall) and transformer unit (ca. 15.25m2 X 2.4m tall) along with associated ancillary development including: 24 no. Power Hubs (ca. 15.25m” X 2.4m), which incorporate the inverters and the transformers within the same unit, 1 no. single storey communications building (11.1m” X 2.5m), 1 no. single storey client building (15.25m2 X 2.9m), 1 no. single storey equipment storage container (7.5m” X 2.7m), 15 no. CCTV cameras mounted on 4m high poles; and perimeter security fencing. The proposed development will also see the installation of ten (10 no.) ISO shipping container units for the purpose of battery storage (30.5 m” X 2.9m). The total development area will be ca. 70.5 ha / 2.3 km away / 29 June 2020Refused
- 22657A single storey extension to the rear of an existing dwelling, and construction of a domestic garage / 3.2 km away / 20 January 2023Refused
- 2560047Entrance, dwelling house, sewage treatment system and percolation area / 3.5 km away / 21 March 2025Refused
- 19600278Partially completed dwelling and for Permission to modify and complete the partially completed dwelling (previous planning ref 08-726 and 01-614), new garage, installation of wastewater treatment system and all associated site works / 3.8 km away / 20 May 2019Refused
- 19601248Partially constructed dwelling and Permission to modify and complete the partially completed dwelling (previous ref 08-726 and 01-614), new garage, installation of wastewater treatment system and associated works / 3.8 km away / 19 June 2020Refused
- 2560212Both Unit 1 and Unit 2 as a shop for the retail sale of goods including ancillary staff offices and canteen along with all shopfront signage / 4.0 km away / 12 May 2025Refused
- 2360198Both Unit 1 and Unit 2 (12.450m) as a shop for the retail sale of goods including ancillary staff offices and canteen, along with all shopfront signage / 4.0 km away / 16 May 2023Refused
- 211802Development will consist of placement of a pay-to-use portable waste compactor for the acceptance of residual and food waste and a pay-to-use portable compactor for mixed dry recyclables. This activity requires the developers to possess a waste collection permit-certificate of registration / 4.1 km away / 15 February 2022Refused