Cauteen, Donohill, Co. Tipperary
Planning application 2360166
DecisionConditional grant
Decided02 May 2023
Application typeRETENTION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Tipperary County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Tipperary has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Cauteen, Donohill, Co. Tipperary?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 17600456A 10 year permission for the construction of a solar PV farm with an export capacity of 8MW comprising appox 40,000 no. photovoltaic panels on ground mounted galvanised steel frames within a site of 15.04ha and all associated development including; 8 no transformer stations, 8 no auxiliary transformer stations, 8 no inverters, 2 no. substations, 2 no. single storey buildings, 2 no. single storey communications buildings, 2 no. single storey client buildings, 4 no. CCTV cameras mounted on 4m high poles, site access road with access gates and internal access tracks and perimeter security fence(2m high) / 0.3 km away / 07 September 2017Granted
- 18600920A slatted cattle shed, machinery shed and upgrading of an existing agricultural entrance and all associated ancillary works / 0.4 km away / 03 September 2018Granted
- 186012481. Permission to retain as constructed dormer windows to their dwelling. 2. Permission to construct an extension to their dwelling and including all associated site works / 0.4 km away / 18 June 2019Granted
- 18600918A new agricultural entrance to access agricultural lands and all associated site works / 0.5 km away / 04 September 2018Granted
- 18601252Existing farm buildings consisting of 1 no. slatted cattle shed and calving pens, 1 no. hay barn and 1 no. silage pit / 0.8 km away / 07 December 2018Granted
- 201571. Demolition of an existing agricultural livestock shed, 2. Construction of a new agricultural livestock shed, milking parlour, dairy, collecting yard & meal bin, 4. Retention Planning is also sought for an existing livestock shed, 5. All associated site works / 0.8 km away / 31 March 2020Granted
- 2460763Development which will consist of a 10-year planning permission to construct and complete a synchronous condenser and battery storage development with a total site area of c. 1.3 hectares comprising of 40 no. battery energy storage units, 5 no. twin skid structures, 1 no. synchronous condenser, 1 no. generator circuit breaker, 1 no. auxiliary transformer and bund, 1 no. step-up transformer and bund, 5 no. control modules, 1 no. cooler unit, 1 no. emergency diesel generator and fuel tank, 1 no. single storey storage container, CCTV cameras, security fencing, access gates, access track, landscaping works, internal cabling and ancillary infrastructure works. The synchronous condenser and battery energy storage development would be operational for 35 years. A Natura Impact Statement (NIS) will be submitted with the application / 0.8 km away / 05 November 2024Granted
- 2260420A solar PV development on a 92 ha site consisting of: - The erection of solar panels on ground-mounted galvanised steel frames, 198 no. string inverters attached to selected ground-mounted galvanised steel frames, 8 no. transformer units, underground cabling, security fencing, CCTV system with pole mounted cameras and landscaping; - 3 no. site entrances with access gates utilizing existing farm field entrances which will be upgraded and internal accesses; - 1 no. on-site IPP switching substation and associated works abutting the existing Cauteen 110kv substation; - a temporary construction compound; and - all associated ancillary development works; at Barnanalleen, Moanmore and Seskin, County Tipperary. The development can operate as an independent solar PV development and in conjunction with the solar PV developments permitted under planning permission references 17/600456 and 21/1109. The operational lifespan of the solar PV development will be 35 years. A Natura Impact Statement will accompany the planning application. / 1.1 km away / 05 October 2022Granted