Planning application 2360547
DecisionConditional grant
Decided15 September 2023
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Tipperary County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Tipperary has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Ballynilard, Tipperary, Co. Tipperary?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2460942(1) previous change of use of part of an existing dwelling to use as general offices, (2) PERMISSION for a change of use of the remaining dwelling part of the existing dwelling to use as general offices and staff facilities and (3) PERMISSION to extend this existing building to provide additional offices and associated staff facilities and all associated site works / 0.1 km away / 07 November 2025Granted
- 2360765Alterations to the previously permitted solar farm as follows: a) Replacement of a permitted single storey terminal electrical station and a separate single storey electrical switchroom (permitted as part of a solar farm permission by Tipperary County Council Reg. Ref. 16600359) with a single storey 20kV substation building on the site of the previously permitted terminal electrical station; repositioning of a permitted storage container, and minor solar panel layout revision adjacent to the proposed substation; repositioning of entrance gate and security fencing at entrance to the solar farm field; and provision of new gate in perimeter security fence adjacent to Ballynilard Stream; and b) Permission to increase the operational period of the solar farm from 25 years to 40 years / 0.1 km away / 17 November 2023Granted
- 21776Demolition of existing entrance and front boundary wall and replace with new set back entrance and front boundary wall and associated site works / 0.5 km away / 21 July 2021Granted
- 2560898The construction of a dwelling house, septic tank and percolation area, entrance and all ancillary site works / 0.5 km away / 04 November 2025Granted
- 224791. filling and raising of former quarry for agricultural use, using clean, inert construction and demolition waste, soil and subsoil including all necessary re-seeding and preservation of boundaries and boundary features. 2. crushing of some imported inert construction and demolition waste including permission for heaping and storage of all recycled aggregate. 3. permission is also sought for the sale and transport off site of crushed, recycled aggregate (circular economy) 4. permission for installation of prefabricated structures comprising staff canteen, office and toilet accommodation including the installation of a on-site effluent treatment system and all associated site development works (this development will require a waste licence) / 0.6 km away / 24 October 2022Granted
- 2260445The un-authorised entrance to farmlands, and permission to complete the said entrance and any boundary alterations as may be required / 0.6 km away / 10 October 2022Granted
- 19600404To fill and raise former quarry for agricultural purposes, using clean inert construction and demolition waste, soil and subsoil. Existing boundaries will be maintained with all mature trees preserved hedgerows strengthened and grass seed will be selected for land restoration / 0.6 km away / 11 June 2019Granted
- 22149To alter and extend their dwelling house / 0.6 km away / 08 April 2022Granted