Corroige Cottage, Rathsasseragh, Tipperary Co. Tipperary
Planning application 2360611
DecisionConditional grant
Decided29 September 2023
Application typeRETENTION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Tipperary County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Tipperary has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Corroige Cottage, Rathsasseragh, Tipperary Co. Tipperary?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 211498Erect a single-story granny flat extension to the side of our dwelling / 0.1 km away / 11 March 2022Granted
- 201383The construction of a mixed-use development comprising of a Nursing Home Facility with an associated assisted living facility and an independent Residential Development of 96 two storey Dwellings at Dundrum Road, Townland of Brodeen and part of Grarranacanty, Tipperary Town, Co. Tipperary. The Nursing Home will accommodate 88 private resident suites and have an associated assisted living facility containing 23 no. 1 bed apartments and 23 no. 2 bed apartments in a detached two storey structure. The nursing home will have 30 no. parking spaces. The assisted living structure will have 60 no. dedicated parking spaces. The proposed residential development will consist of: 24 no. four bedroom semi-detached dwellings with 48 no. car parking spaces, 64 no. three bedroom semi-detached dwellings with 128 no. car parking spaces, 8 no. five bedroom detached dwellings with 24 no. car parking spaces. There is a provision made for 34 no. visitor car parking spaces within the residential development. The overall development will be accessed by a new vehicular and pedestrian access from the Dundrum Road/St. Michaels Avenue Roundabout, boundary treatments, hard and soft landscaping, private and public open spaces, internal roads and pedestrian walkways, all ancillary services and associated site development works above and below ground level all at a site of approximately 7.9 hectares. All works to take place at the site / 0.4 km away / 08 December 2021Granted
- 21384Erection of steel palisade fence, colour green at the south and east side of site. Construction of concrete blockwork wall at north side of site and all associated site and ancillary works / 0.5 km away / 19 May 2021Granted
- 21214Erection of a single-storey extension to the side of our dwelling / 0.6 km away / 09 September 2021Granted
- 2560659The demolition of an existing porch and to replace it with new porch and permission to modify front boundary wall and construct vehicular entrance and install dropped kerbs and associated site works / 0.6 km away / 03 September 2025Granted
- 2560754An extension to existing warehouse building together with all associated site works / 0.6 km away / 24 September 2025Granted
- 2360918A 1087m2 warehouse building, HGV & car parking together with all associated site works / 0.6 km away / 17 April 2024Granted
- 19600801A new industrial storage unit, entrance and all ancillary works including roadways, turning area, perimeter fencing and connection to the public foul and storm water sewers / 0.6 km away / 11 August 2020Granted