Lehinch, Lorrha, Nenagh
Planning application 25129
DecisionConditional grant
Decided25 February 2026
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Tipperary County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Tipperary has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Lehinch, Lorrha, Nenagh?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2460674Existing dwelling house, septic tank with percolation area and all associated site works on revised site boundaries (Previous Reference no. 5114804) / 0.5 km away / 04 March 2025Granted
- 2175Construction of a single storey detached dwelling house, detached garage, wastewater treatment system, site entrance and all ancillary site works thereto / 1.0 km away / 16 March 2021Granted
- 19600744The construction of a single storey extension to the north eastern side of existing dwelling comprising 1 no. bedroom, en-suite bathroom and all ancillary site works thereto / 1.0 km away / 09 August 2019Granted
- 22496A proposed split level two-storey dwelling, a domestic garage outbuilding, a proposed wastewater treatment system, with a raised percolation area, all associated siteworks including a site entrance / 1.0 km away / 06 April 2023Granted
- 25250Of planning ref. 19/1287 for developments at; Connaught Harbour to Portumna Bridge, Fairyhill following the ESB flood embankment, through Lough Derg Water Recreation Park, Portumna to Portumna Forest Park, Portumna Demesne, County Galway. The development consists of two Phases, Phase 1: a new multi-use shared leisure route (Blueway), 2.4km in length, with tailored surface finishes, information, directional and safety signage and all other associated ancillary works. The route commences at Portumna Bridge, crosses over the ESB flood bank via a new timber boardwalk, following along the toe of the flood bank connect to Lough Derg Water Recreation Park. A new cycle advisory lane, marked parking bays upgrade to footpaths shall be constructed at Lough Derg Water Recreation. The route continues through adjacent farm land which connects to OPW lands that lead to the existing access road at Portumna Forest Park. Phase 2: a new 8 berth marina, incorporating boat pump-out at Connaught Harbour, the removal of the two existing buildings and construction of a new car parking area. Located at the existing Waterways Ireland works yard at Portumna bridge the three existing building shall be removed, for the construction of a new car parking and amenity area, including a new timber covered space incorporating a bat roost. Existing footpaths shall be repaired where required and a new Toucan road crossing shall be constructed to connect to the Blueway constructed in Phase 1. The proposal will involve works to or within the curtilage of the following protected structures; Portumna Harbour, Fairyhill (RPS 477) and Portumna Castle, Portumna Demesne (PRS 3785). A Natura Impact Statement have been prepared and included as part of the planning application / 1.1 km away / 14 November 2025Granted
- 191287For developments at; Connaught Harbour to Portumna Bridge, Fairyhill following the ESB flood embankment, through Lough Derg Water Recreation Park, Portumna to Portumna Forest Park, Portumna Demesne, County Galway. The development consists of two Phases, Phase 1: a new multi-use shared leisure route (Blueway), 2.4km in length, with tailored surface finishes, information, directional and safety signage and all other associated ancillary works. The route commences at Portumna Bridge, crosses over the ESB flood bank via a new timber boardwalk, following along the toe of the flood bank connect to Lough Derg Water Recreation Park. A new cycle advisory lane, marked parking bays upgrade to footpaths shall be constructed at Lough Derg Water Recreation. The route continues through adjacent farm land which connects to OPW lands that lead to the existing access road at Portumna Forest Park. Phase 2: a new 8 berth marina, incorporating boat pump-out at Connaught Harbour, the removal of the two existing buildings and construction of a new car parking area. Located at the existing Waterways Ireland works yard at Portumna bridge the three existing building shall be removed, for the construction of a new car parking and amenity area, including a new timber covered space incorporating a bat roost. Existing footpaths shall be repaired where required and a new Toucan road crossing shall be constructed to connect to the Blueway constructed in Phase 1. The proposal will involve works to or within the curtilage of the following protected structures; Portumna Harbour, Fairyhill (RPS 477) and Portumna Castle, Portumna Demesne (PRS 3785). A Natura Impact Statement have been prepared and included as part of the planning application / 1.1 km away / 15 June 2020Granted
- 25133Machinery/general purpose store and all associated site work / 1.2 km away / 21 August 2025Granted
- 2460740Of alterations to existing petrol station including (i) removal of stone wall and provision of bollards along Bridge Road; (ii) revisions to the height and design of the forecourt canopy inclusive of illuminated signage; (iii) additional signage inclusive of directional signage at entrance and exit of the site, the eastern and southern elevations of the former retail unit and interior of boundary fencing; (iv) replacement of 1 no. totem sign and replacement of vent pipes with 1 no. vent pipe totem sign; (v) brick paving at the entrance, under canopy and at northern, eastern and western boundaries; (vi) relocation of offset fill and associated structure at eastern site boundary; (vii) provision of 1 no. drive through car wash with associated signage and 1 no. lance car wash with associated signage, and associated pump house located to the north west of the site; (viii) ACO drainage channels around forecourt, along tanker stand and at the entrance and exit to the site; (ix) provision of apartment bin storage adjoining ‘shop compound’ comprising mini vent pipes, water tank, pumping station and oil and car wash interceptors to the north east of the site; (x) provision of 4 no. car parking spaces to serve the existing apartments; (xi) provision of new timber boundary fence on the northern, eastern and western site boundaries; (xii) change of use of retail unit to storage; (xiii) addition of fresh water tank; (xiv) all associated works inclusive of infrastructure, lighting, surface drainage, boundary treatments, and site works; and (xv) revised operating hours to provide a 24-hour self-service petrol station. Gross floor space of work to be retained: (Pumphouse) 25.77 sqm & (Change of use Commercial) 188.00 sqm / 1.3 km away / 30 July 2024Granted