Application description published by Tipperary County Council.
1. An overall planning application site area of c. 6.3 hectares consisting of a proposed bio-renewables production facility, buffer screening, ancillary facilities and site access via the existing permitted quarry entrance. 2. The proposed bio-renewables production facility (incorporating anaerobic digestion) compound will cover an area of c. 4 hectares. The production facility will convert feedstocks to end of line co-products, namely bio-methane (gas), compressed bio-methane (bio-CNG), carbon dioxide (CO2), electricity (green), organic fertilisers (pelleted) and water, with integrated solar energy generation. The adjacent Roadstone Killough Quarry plant will utilise the electricity, bio-methane and water. Pelletised fertiliser will be available for supply to local agriculture and traders off-site. CNG and CO2 will be pressurised and stored for ongoing draw-off by tankers to points of re-use off-site. Demolition of existing quarry store building (c. 158m²) to facilitate the proposed development. 3. The facility will consist of the following elements to be constructed: a) two-storey administration building with (gross floor area 664m² and 8.15m in height) to accommodate reception and storage areas, canteen, laboratory, first aid room, control room/electrical switch room, storage room, toilets, offices, conference room, training room and kitchenette, and roof solar panels 315m²; b) dry matter reception building (gross floor area 5,215m² and 12.7m in height) with roof solar panels 4,000m²; c) workshop building (gross floor area 122.1m² and 8.9m in height) to accommodate workshop and internal gantry crane, store and office at ground level and office at mezzanine level; d) bio-conversion building (gross floor area 3,257m² and 12.5m in height) with roof solar panels 2,400m²; e) pre-treatment, equalisation and gas upgrading building (gross floor area 5,685m² and 12m in height) to accommodate pre-treatment & equalisation area (3,527m²), utilities area (376m²), heat recovery plant area (361m²), water treatment recovery area (316m²), and gas upgrading facility (1,105m²) with roof solar panels 3,850m²; f) digestate handling building (gross floor area 692m² and 8.6m in height) to accommodate palletiser station/packing station area (150m²), solid dryer/vacuum evaporator area (392m²) and nutrient adjustment facility (150m²); g) warehouse storage building (gross floor area 158m² and 11.2m in height); h) bio-filling station building (gross floor area 300m² and 9.75m in h
Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.
PL-500924-TY-26Submitted 05 March 2026 / decided Not recorded
Status not recorded
Appeal submittedAppeal reference PL-500924-TY-26
05 March 2026
No appeal document has been bound to this case yet; the timeline will enrich as indexing continues.
Decision details
Core application dates and identifiers from the public planning record.
Application ref
2560019
Received
13 January 2025
Decided
06 February 2026
FI requested
Yes
Authority
Tipperary County Council
Application type
PERMISSION
Outcome
Refused
Source status
Documents indexed. Reason extraction for Tipperary has not started yet.
Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.
Refusal reasons
Refusal reasons not machine-readable
Documents are indexed. Reason extraction for Tipperary has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Killough Quarry, Gaile Townland, Holycross Co. Tipperary?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.
Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.
Source documents
Original council portal records and source PDFs where available.
Included in site brief
1 council document — in the €39 site risk brief
Refusal reasoning quoted verbatim from the council decision file
Policy citations and the planner's own wording