Main Street, Ballingarry, Co. Tipperary
Planning application 2560460
DecisionRefused
Decided13 May 2026
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Tipperary County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
Refusal reasons not machine-readable
Documents are indexed. Reason extraction for Tipperary has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Main Street, Ballingarry, Co. Tipperary?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2630Planning permission 201340 for an agricultural feedstock based 1MW Anaerobic Digestion (AD) biomethane facility producing renewable energy facility utilising 29,800 tonnes per annum of agriculture sourced feedstocks, the proposed development will occupy an area of 2.31 hectares and will include the following elements: 1 no. single storey reception building with welfare facilities, staff and visitor car-parking, 1 no. truck delivery and pickup hardstanding area, 1 no. site perimeter low level bund, 1 no. overground water storage tank, 2 no. 40ft storage containers, 1 no. 20ft storage container, 1 no. propane storage tank, 1 no. methane storage tank, 1 no. feedstock hopper/feeder, 1 no. wheel wash, 1 no. rainwater harvesting system, 1 no. underground rainwater storage tank, 1 no. weighbridge, 2 no. anaerobic digester tanks, 2 no. digestate storage tanks, 1 no. slurry storage tank, 4 no. feed-stock clamps, 1 no. biogas and biomethane flare, condensate trap and pump, 1 no. 500 kWCHP plant, 1 no. pump and control room container, 1 no. biogas cleaning and upgrading container, 1 no. biogas compression container, 2 no. water interceptor units, 1 no. surface water soak-away designed to BRE365, surface water and feedstock leachate management infrastructure, 1 no. 6 PE wastewater treatment system, 1 no. ESB substation, new entrance off L1071, external perimeter stockproof fencing and gates, landscaping and tree screening and associated site works / 2.0 km away / 05 June 2026Refused
- 2360763(1) The construction of 7 no. wind turbines and associated hardstand areas with the following parameters a) total tip height range of 179.5m – 185m, b) rotor diameter range of 149m – 163m, c) hub height range of 103.5m to 110.5m; (2) 1 no. permanent 38kV electrical substation which will be constructed in the townland of Faddan Beg consisting of a single storey control building with welfare facilities, all associated electrical plant and equipment, battery energy storage system, security fencing, all associated underground cabling, wastewater holding tank and all ancillary works and equipment; (3) All works (within County Tipperary) associated with the connection of the proposed wind farm to the national electricity grid, via the provision of underground electrical cabling (38kV) to the existing Dallow 110kV substation in the townland of Clondallow, Co. Offaly; (4) Provision of 10 no. joint bays, communication chambers and earth sheath links along the underground electrical cabling route; (5) reinstatement of the road or track surface above the proposed cabling trench along existing roads and tracks; (6) all associated underground electrical and communications cabling connecting the turbines to the proposed wind farm substation; (7) 1 no. meteorological mast with a height of 107m above ground and associated foundation and hard-standing area; (8) upgrade of existing tracks and roads and the provision of new site access roads; (9) all works associated with the provision of a new permanent site entrance off the L5040 local road; (10) provision of 5 no. new access and egress points along the L5041 local road in the townlands of Cloncorig, Faddan More and Coolderry; (11) Provision of 4 no. peat repository areas and 3 no. spoil repository areas; (12) 2 no. temporary construction compounds with temporary site offices and staff facilities; (13) Accommodation works along the public road network along the N52 national secondary road in the townland of Ballyloughnane to facilitate the delivery of turbine components and other abnormal sized loads; (14) Site Drainage; (15) Tree Felling; (16) Operational stage site signage; and, (17) all associated site development works, ancillary works and apparatus. - Works within the curtilage of Protected Structures RPS Ref. TRPS336 (Ballyloughnane Bridge) and RPS Ref. TRPS519 (Croghan Bridge) / 5.6 km away / 16 November 2023Refused
- 2460473(1) the change of use of the existing Montessori school to 1 No. dwelling; (2) the change of use of existing stand-alone sensory room to store ancillary to dwelling; (3) alterations to the existing elevations and all ancillary works / 6.7 km away / 01 August 2024Refused
- 17323CONSTRUCTION OF NEW DWELLING HOUSE, DOMESTIC GARAGE, SEPTIC TANK AND PERCOLATION AREA, BORED WELL, ENTRANCE AND ANCILLARY WORKS / 6.7 km away / 02 January 2018Refused
- 2460720To construct new dwelling, attached carport/store, septic tank and percolation area, vehicular entrance and all associated site work / 6.8 km away / 19 February 2025Refused
- 23284Dwelling house, attached carport/store, installation of new ETU with percolation area, new entrance and all associated site works / 6.8 km away / 29 April 2024Refused
- 2460457The advertising sign to the side of the road / 7.5 km away / 29 January 2025Refused
- 22249(1) CONSTRUTION OF 5 NO. DETACHED AND 2 NO. SEMI DETACHED HOUSES WITH CONNECTION TO PUBLIC SERVICES AND ALL ASSOCIATED SITE WORKS. (2) MODIFICATION TO ENTRANCE / 7.8 km away / 11 July 2022Refused