Elsinore, Glen Road, Tramore
Planning application 17548
DecisionConditional grant
Decided21 September 2017
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Waterford City and County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Waterford has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Elsinore, Glen Road, Tramore?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 22791Of as constructed extensions comprising single storey extension to the front, side and rear together with a roof dormer extension at development address / 0.3 km away / 26 October 2022Granted
- 2560055To Filling of outcrops of rocks and ground depressions in an agricultural field with imported sub-soil and topsoil depth between 2m – 6m depending on ground depression not exceeding 24,000 tonnes per annum and permission for new entrance and all associated site works / 0.3 km away / 26 March 2025Granted
- 2017Changes to permission previously granted under planning reference 18/852 comprising changes to elevations, omission of extension to north and use of CMD Environmental Aquamax waste water treatment unit with Ecoflo Territory Coconut Filter, together with all associated site works / 0.4 km away / 03 March 2020Granted
- 18852Rear extension, permission for side extensions, new entrance porch, elevational changes, new waste water treatment system and percolation area and all associated site works / 0.4 km away / 19 February 2019Granted
- 22167RETENTION PERMISSION for a glazed porch constructed to the rear of the dwelling and PLANNING PERMISSION to convert the attic of our dwelling from storage to living accommodation. Works will include construction of a new window to the eastern elevation at first floor level, installation of new roof windows to the southern roof along with associated site development works to facilitate the works / 0.5 km away / 27 April 2022Granted
- 22929Construction of a single storey dwelling, wastewater treatment system, percolation area, splayed entrance and all ancillary site works / 0.6 km away / 15 December 2022Granted
- 2360319For indefinite retention of as built balcony and stairs to rear of existing dwelling / 0.8 km away / 12 September 2023Granted
- 18888The construction of a single storey extension to the side and rear of existing dwelling and all associated works / 0.8 km away / 21 February 2019Granted