An Linn Bhuí, Baile na nGall Mór, Dún Garbhán
Planning application 1995
DecisionConditional grant
Decided11 April 2019
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Waterford City and County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Waterford has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near An Linn Bhuí, Baile na nGall Mór, Dún Garbhán?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 1946Teach cónaithe stór go leith agus garaiste a thógaint chomh maith le bealach isteach nua, córas cóireála séarachais, limistéar meath-laithe agus áiseanna is oibreacha eile ábartha a bhaineann leis an tógail ag an láithreán / 0.1 km away / 26 March 2019Granted
- 22930Development to include the construction of two storey extension to rear, side and over existing dwelling, two no. single storey rear extensions, entrance canopy and car port to front of existing dwelling. Works to include single storey extension to existing garage, new garden shed and all associated internal remodelling and site works / 0.1 km away / 15 March 2023Granted
- 21764Le hathruithe a dhéanamh agus críoch a chur le tigh cónaithe, garáiste agus slí isteach gur tugadh cead dóibh cheana faoi PD 08/213, córas cóireála fuíolluisce a insealbhú agus oibreacha fo-ghabhálacha / 0.2 km away / 23 November 2021Granted
- 17687The construction of a new petrol filling station together with associated overhead canopy (4.5 meters high) and 2 no. fuel dispensing pumps, compressed air tyre pump and water dispenser, new vehicular access entrance, new associated car parking, installation of 2 no. 40,000 litre underground fuel storage tanks together with all ancillary and associated site works / 0.2 km away / 22 May 2018Granted
- 2460358Is é atá i gceist san fhorbairt ná an síneadh le díon cothrom atá ann cheana féin a leagan go talamh, mar aon le hathruithe inmheánacha agus síneadh aon stóir nua a thógaint siar ó dheas, athruithe ar na fuinneoga atá ann cheana féin agus fuinneoig nua a oscailt siar ó thuaidh ón teach atá ann cheana féin. Lorgaítear cead chomh maith do shlí isteach nua, mar aon le córas searachais nua agus gach gné d’oibreacha láithreáin a bhaineann leo ag an láithreán seo. / 0.2 km away / 18 October 2024Granted
- 2560375Áiseanna páirceála nua, chomh maith le athruithe ar an mbóthar rochtana dá réir maraon le gach obair fhorbartha choimhdeachta agus seirbísí láithreáin a théann leis. / 0.2 km away / 18 July 2025Granted
- 2660332(a). Single storey entrance building with function space, gallery space, staff kitchen and office space (total gfa: 480 sqm) (b). Two storey office block (total gfa: 1023 sqm) (c). Single storey plant/ service block (total gfa: 65 sqm) The site development works include - a proposed central courtyard, covered walkways and small outdoor performance space. - New circulation road and staff parking. - Primary vehicular access to the site is maintained via the existing main entrance to the site from R674 with proposed upgrading of entrance way. - Bin Refuse Storage Area and Designated Bicycle Shelter providing for 17 no. spaces. - New external landscaped areas. - Extension to existing Playground with new playground facilities and parking. - All associated site development works including all landscaping and site service works. / 0.2 km away / 09 July 2026Granted
- 2560236Is é atá i gceist san fhorbairt ná tigh nua aon úrlár a thógaint le garáiste, bealach isteach nua, córás nua fuíolluisce, maraon le ceangailt leis an gcorás uisce poiblí agus gach gné d’oibreacha láithreáin a bhaineann leis ag an láithreán seo i / 0.3 km away / 30 September 2025Granted