Ballyneety, Dungarvan, Co. Waterford.
Planning application 2560345
DecisionConditional grant
Decided11 July 2025
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Waterford City and County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Waterford has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Ballyneety, Dungarvan, Co. Waterford.?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 1962For the construction of a new single storey house, a garage, a waste water treatment system, a bored well and an entrance along with all associated site works / 0.3 km away / 02 April 2019Granted
- 20135To raise the ground levels of the existing field with inert material and to operate the existing field entrance along with all associated site works / 0.5 km away / 11 June 2020Granted
- 17465To upgrade and improve existing agricultural entrance on N72 / 0.7 km away / 16 August 2017Granted
- 17156A 10 year permission for the construction of an up to 5MW solar PV farm comprising approximately 20,000 no. photovoltaic panels on ground mounted galvanized steel frames within a site of 8 hectares and all associated development including 4 no. transformer stations, 4 no. auxiliary transformer stations, 4 no. inverters, 2 no. substations, 1 no. single storey storage building, 1 no. single-storey communictions building, 1 no. single-storey client building, 2 no. single storey battery buildings, 3 no. CCTV cameras mounted on 4m high poles, site entrance and access road, site access gate and perimeter security fencing (2m high) / 0.9 km away / 03 May 2017Granted
- 2460589To amend planning permission ref: 17/156 which is in respect of a 10 year permission for the construction of a 5MW solar PV farm and Battery Energy Storage System facility (BESS) at Killadangan, Dungarvan, County Waterford. The proposed amendment is to enhance the Battery Energy Storage System facility (BESS) and associated infrastructure located at the southern end of the permitted solar farm site involving an area of approximately 1.26 hectares. The proposed amendment to the permitted solar farm involves the following elements: (i) The omission of an area of permitted photovoltaic panels and associated infrastructure and structures. (ii) The installation of 48 no. BESS units, each measuring (2.9m high x 6.1m long x 2.4m wide). (iii) Supporting the BESS will be 6 no twin skid structures (6m high x 6m wide x 10.2m in long), comprising of transformer and inverter sections. (iv) 1 no spare parts container (6.1m long x 2.4m wide x 2.6m high). (v) 1 no IPP Building (4m high x 14m long x 10m wide). (vi) The installation of 4 meter high pole-mounted CCTV cameras. (vii) 2m high security fencing and access gates for vehicles. (viii) Landscaping works. (ix) Internal Road. (x) Ancillary works. / 0.9 km away / 25 November 2024Granted
- 2360452For an extension to existing mechanical pipework building and associated site works. Works will involve the construction of a steel frame over existing concrete yard with extension joining directly into existing mechanical pipework building unit. Heights will match in with existing building as will finishes. / 1.0 km away / 16 November 2023Granted
- 17510Indefinite retention of a Carbon Piping and Storage Facility which extends to the rear of existing Carbon Steel Fabrication Facility previously granted under PD04/1733 / 1.0 km away / 22 March 2018Granted
- 2360599For an eastern extension to existing mechanical pipework building and associated site works. Works will involve the construction of a steel portal frame over existing concrete yard with extension joining directly into existing mechanical pipework building unit. Heights will match in with existing building as will finishes. / 1.0 km away / 02 February 2024Granted