Harbour Street, Mullingar, Co.Westmeath
Planning application 176077
DecisionConditional grant
Decided20 June 2017
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Westmeath County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Westmeath has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Harbour Street, Mullingar, Co.Westmeath?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2560513Construction of a single storey detached gym building and all associated site works. The proposed works are within the curtilage of a protected structure, St. Mary’s College (Hevey Institute) – RPS no: 019-157 / 0.1 km away / 08 June 2026Granted
- 22507Consisting of construction works to demolish part of an existing two-storey toilet block; Construct 3 no. new two storey en-suite toilet extensions to existing classrooms. Insert a new passenger lift into the existing building; Construct a new single storey front entrance porch; Alter parts of the existing layout to provide new toilet facilities; and carry out associated alterations, refurbishments and site works. The existing school building is within the curtilage of protected structures - Presentation Convent RPS. No 019-148 & 019-149. / 0.1 km away / 14 February 2023Granted
- 196195To construct a new single storey 5 screen cinema, of gross plan area approx. 875sqm and approx. 8.625m high and associated site works / 0.2 km away / 02 April 2020Granted
- 2360362Construction of a domestic Garage / Workshop with Store & utility area to rear of existing dwelling and all associated site development works / 0.2 km away / 29 January 2024Granted
- 22464Construction of a new part single, part two storey restaurant (internal floor area circa. 269 sq.m), circa. 6.1m high with a raised external dining area at first floor level and associated site works/car parking / 0.2 km away / 06 June 2023Granted
- 206285The development will comprise of the following: Retention of a temporary structure comprising of a 520m2 tent which is located at the existing external play area to the north-east of the school grounds. The proposed development is within the curtilage off the Hevey Institute, a protected structure No. 019-157 under the Record of Protected Structures of Westmeath County Council County Development Plan 2014 - 2020. / 0.2 km away / 08 December 2020Granted
- 196295565m2 two storey extension at the northeast corner of Colaiste Mhuire comprising of a construction studies room with prep room, a home economics room, two interconnecting classrooms and associated circulation space and all associated works including connecting into existing building and external and internal services. The proposed development is within the curtilage of the Hevey Institute, a protected structure No 019-157 under the Record of Protected Structures of Westmeath County Council Development Plan 2014-2020 / 0.2 km away / 16 December 2019Granted
- 2660242To construct an extension at the side and rear of my existing dwelling to include a conversion of my existing garage to a bedroom and bathroom and extend it to include a utility and to increase the entrance at the front by 1.2 metres with all ancillary site works / 0.2 km away / 06 July 2026Granted