Rathgarrett, Tyrrellspass, Co Westmeath
Planning application 196273
DecisionConditional grant
Decided25 November 2019
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Westmeath County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Westmeath has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Rathgarrett, Tyrrellspass, Co Westmeath?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 186040Partially construction dwelling (sub-floor rising wall level) and all commenced site works and permission to complete development as previously granted planning permission under planning file 08/4067, namely (planning permission to erect a single storey dwelling house, domestic garage, proprietary waste water treatment system, percolation area, open a new site entrance and carry out all ancillary site development works / 0.2 km away / 05 June 2018Granted
- 186133Construction of an extension to the side and rear and restore existing cottage which consists of 3 bedrooms, one with en-suite, bathroom, sitting room, utility, hall, kitchen, dining area, stove and fireplace and to construct a chimney and stone porch and to install a new septic tank and percolation area with all ancillary site works. / 0.4 km away / 19 October 2018Granted
- 2360112Construction of a dwelling house & detached garage with treatment system & percolation area with all ancillary site works / 0.4 km away / 17 August 2023Granted
- 206168Retention and continuation of development at this site, Toar Biomass Facility in the townland of Rathgarrett, Co Westmeath. The development consists of works for an existing biomass facility on a site of 14.34 ha. The facility is used for the storage and seasoning of biomass logs (6-9 Months) followed by chipping of the seasoned logs. The proposed retention development consists of the installation of temporary structures, a weightbridge cabin (7.44 sq.m) weighbridge (125 sqm). Retention permission is also sought for a biomass storage area (4.7km linear log storage space equating to 24,910 tonnes of wet logs), a low steel post and rail fence with gates at the entrance from the L1113), unpaved access tracks (4.7km) in length, a paved roadway (120m total length from the site entrance) and all ancillary works. The log storage area or long pile is linear with a diameter of c. 4m and up to a height of 4.1m. There is no storage of chipped biomass on site. This site will be operational until 2030. Planning permission is sought for alterations to improve the existing access of the L1113. / 1.0 km away / 07 December 2020Granted
- 2360408New dwelling house, domestic garage, new site entrance, septic tank and percolation area and all associated site works / 1.1 km away / 19 April 2024Granted
- 2461RETENTION of existing shed and arch wall / 1.1 km away / 24 October 2024Granted
- 2460397Construction of a new dwelling, garage, wastewater treatment system and percolating area and all associated site works / 1.1 km away / 10 December 2024Granted
- 196246Proposed new dwelling house, septic tank/effluent treatment system, percolation area & all associated site works / 1.2 km away / 05 February 2020Granted