6 The Park, Athlone, Co Westmeath
Planning application 197125
DecisionConditional grant
Decided26 July 2019
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Westmeath County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Westmeath has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near 6 The Park, Athlone, Co Westmeath?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 207065Retention of the removal of the Harry Clark Studios stained glass from the Old House Building in the former school, St Aloysius College, Athlone, Co Westmeath, which is a protected structure, RPS No.035. (It is proposed to install it into the new school building, which is under construction at Crannagh, Summerhill, Athlone, Co Roscommon. The college was formerly known as St Joseph;s College which has amalgamated with St Aloysius College and is now known as Coláiste Chairian) / 0.1 km away / 15 July 2020Granted
- 187057(i) The construction of an additional floor level to the single storey element of the south elevation of the existing house (ii) revising of existing bay window on the east elevation to a rectangular shape and extending ground floor south elevation (iii) provision of an additional window to the existing ground floor south elevation (iv) the replacement of 3 windows and 1 door on the ground floor west elevation with two large glazed openings (v) the replacement of 1 window on the existing first floor west elevation with 2 windows (v) the addition of a rooflight to the west elevation and all ancillary site works / 0.1 km away / 15 May 2018Granted
- 197224Retention planning permission to retain a change of use from former parochial house to Air B&B and planning permission to construct an extension to the rear of the house at ground floor level to be used ancillary to Air B&B and all associated site works / 0.2 km away / 19 December 2019Granted
- 2660204Retention Permission is being sought for the sub division of two number commercial units. The first sub division is for a 159m square commercial unit into one number 85m square commercial unit and one number 70m square commercial unit. The second sub division is for a 176m square commercial unit into two number 86m square commercial units / 0.2 km away / 18 June 2026Granted
- 22169Development of new sewers which will consist of: A new 450mm diameter open cut combined sewer on Deerpark Road and Clonown Road constructed within a works construction area. A new combined tunnel sewer up to 1200mm diameter, through the Showgrounds from Deerpark Road to the west bank of the River Shannon constructed within a 10m wide works construction area. A new combined tunnel sewer (Lower Shannon Sewer Crossing), up to 1500mm diameter, that runs underneath the River Shannon to the east bank in Burgess Park at Golden Island constructed within a 10m wide works construction area. 1 No. Tunnel Shaft and associated temporary works construction compound in Burgess Park in Golden Island (Kilmaine) Townland. 3 No Tunnel Shafts and associated temporary works construction compounds west of the Shannon in Athlone Showgrounds and in Athlone & Bigmeadow Townland. 2 No. Tunnel Shafts and associated temporary works construction compounds on Deerpark Road in Athlone & Bigmeadow Townland and Doovogue Townland. Decommissioning and demolition of the existing West Side Pumping Station. Temporary construction access road along the sewer route in Athlone Showgrounds. Temporary construction access road through Burgess Park. Decommissioning and demolition of the existing siphon inlet chamber and storm overflow chamber. And all associated site works. A Natura Impact Statement will be submitted to the Planning Authority with the Application. / 0.2 km away / 27 May 2022Granted
- 177182We, Irish Water, intend to apply for Planning Permission for development of new sewers in Athlone, Co. Westmeath on Deerpark Road in Doovoge Townland, through Athlone Showgrounds in Athlone & Big Meadow Townland and across the River Shannon River to the east bank in Burgess Park in Golden Island (Kilmaine) Townland. The development will consist of the following: A new 450mm diameter open cut combined sewer on Deerpark Road and Clonown Road constructed within a works construction area. A new combined tunnel sewer, up to 1200mm diameter, through the Showgrounds from Deerpark Road to the West bank of the River Shannon constructed within a 10m wide construction corridor.A new combined tunnel sewer (Lower Shannon Sewer Crossing), up to 1500mm diameter, that runs underneath the River Shannon to the east bank in Burgess Park at Golden Island constructed within a 10m wide construction corridor.1 No. Tunnel Shaft and associated temporary works construction compound in Burgess Park in Golden Island (Kilmaine) Townland. 3 no Tunnel Shafts and associated temporary works construction compounds west of the Shannon in Athlone Showgrounds and in Athlone & Big Meadow and Townland. 2 no Tunnel Shafts and associated temporary works construction compounds on Deerpark Road in Athlone & Big Meadow Townland and Doovoge Townland. Decommissioning and demolition of the existing West Side Pumping Station.Temporary construction access road along the sewer route in Athlone Showgrounds. Temporary construction access thourgh Burgess Park. Decommissioning and demolition of the existing siphon inlet chamber and storm overflow chamber,And all associated site works. A Natura impact statement will be submitted to the planning authority with the application. / 0.2 km away / 23 November 2017Granted
- 2471Construction of single storey extension to side of existing dwelling with two number carparking with access onto Parnell Square and all associated site services / 0.3 km away / 30 January 2025Granted
- 2527Retention Permission for changes to grant of previous planning ref 24/71, which include to retain revised ground floor plan and elevation changes and associated services / 0.3 km away / 14 August 2025Granted