Carrick, Dalystown, Mullingar
Planning application 21467
DecisionConditional grant
Decided17 January 2022
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Westmeath County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Westmeath has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Carrick, Dalystown, Mullingar?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 176166To construct a storey & a half type house, garage, septic tank & percolation area and all associated site works. / 0.1 km away / 18 July 2017Granted
- 196090Construction of a new storey and a half type dwelling house, domestic garage, new vehicular entrance, proprietary wastewater treatment system and soil polishing filter and all ancillary site services / 0.3 km away / 12 June 2019Granted
- 2460215Construction of a slatted shed with concrete areas with all ancillary site works / 0.6 km away / 15 November 2024Granted
- 2560200To construct a community sports facility, which shall include one number grassed playing pitch, a community exercise / walking track with exercise stations and a single storey clubhouse with two number dressing rooms and a function room. Permission is also sought to upgrade existing entrance to public road, to install a car park and bus set down facilities, to upgrade existing site boundaries, to connect to existing public watermain and to install a tertiary Wastewater treatment system with infiltration bed and all associated site works. / 1.1 km away / 08 December 2025Granted
- 2360257Upgrade and extend existing dwelling and to upgrade existing shed, to relocate and upgrade: (a) existing private well, (b) existing entrance to public road, (c) existing septic tank and percolation area with a tertiary treatment system with coco filter and infiltration bed, and all associated site works / 1.3 km away / 27 October 2023Granted
- 2460451Construction of a dwelling house with treatment system and percolation area with all ancillary site works / 1.3 km away / 10 July 2025Granted
- 196061A private dwelling house, proprietary effluent treatment system and percolation area, domestic garage, entrance onto public road and all ancillary site services / 1.4 km away / 23 July 2019Granted
- 2560006RETENTION permission and permission for development at this site of c. 0.65 hectares. The proposed development will consist of gas network infrastructure including a permanent above ground pigging compound. This will include (i) above and below ground pipework, (ii) 19.1m x 14m x 2.4m high security fencing; (iii) internal concrete road pavement and gravelled areas, (iv) vehicular access to Kilbrennan Road (L1127), and (v) all associated site development works including; construction works, surface water drainage, and landscaping features. In addition, retention permission is sought for temporary widening of existing field entrance for use as a construction entrance, and associated temporary working area for a period of up to 2 years. The development relates to the granted application to the Commission for Regulation of Utilities (CRU) under Section 39A of the Gas Act 1976, as amended, for an underground gas transmission pipeline (known as the ‘Kiltotan Pipeline’). An Environmental Impact Assessment Report and Appropriate Assessment Screening Report has been prepared with respect to the project and will be submitted with the application / 1.5 km away / 06 March 2025Granted