Townlands of, Parcellstown and Shanonagh, Mullingar
Planning application 22113
DecisionConditional grant
Decided01 September 2022
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Westmeath County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Westmeath has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Townlands of, Parcellstown and Shanonagh, Mullingar?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2560201Amendments to the design of an approved solar farm development on lands within the townlands of Parcellstown, Shanonagh, Clondardis, Co. Westmeath (Westmeath County Council Planning Reg. Ref. 22/113). The proposed amendments include an extension of the red line boundary to provide for access from the approved Clondardis solar farm to the east (Westmeath County Council Planning Reg. Ref. 20/6132); Minor revisions to access tracks throughout the site; Revised perimeter fencing; Inclusion of a new perimeter gate; A new bridge crossing an existing arterial drain within the site; Underground power and communication cables and ducts; An optimised Solar PV Panel configuration within the same areas of the site as the previously permitted solar farm to comprise 238,362 square meters of solar panels; Solar panel array height increase from 3m to 3.2m; Rerouting of the permitted access track within the northern parcel; Revised hardstanding and electrical skid provision; Removal of on-site substation; Removal of storage container; Minor red line boundary revisions and all other associated ancillary development. Permission is also sought to extend the life span of the consented development from 35 years to 40 years. / 0.0 km away / 10 September 2025Granted
- 17602810 year permission which will consist of a solar farm with an export capacity of 12.458mw comprising photovoltaic panels on ground mounted frames with associated infrastructure including 7 no. invertor cabins, 1 no. control building, 1 no. customer cabin, 1 no. DNO substation, temporary construction compound, ducting and electrical cabling, perimeter agricultural fencing, mounted CCTV cameras and internal access tracks. / 0.7 km away / 23 May 2017Granted
- 2360200An amendment planning application previously granted permission under references PL/17/6028 & PL/17/6224 in the townland of Slanemore, Mullingar, Co Westmeath. The proposed amendments to the previously consented solar farm will include the following: • Provision of a new 38kV on-site substation control building & compound • Reconfiguration of consented solar array to optimise layout • Reconfiguration of internal maintenance/access roads • Provision of a new access from the R393 Regional Road • Adjustments to the red line boundary to cater for the new access and access track / 0.8 km away / 26 June 2024Granted
- 206132Amendment of the design of the approved development (Westmeath County Council Planning Reg. Ref. 17/6239 & An Bord Pleanala Reg, Ref. PL25M.301116) which comprises consent for the development of a ground mounted solar photvoltaic (PV) farm consisting of the following; up to an area of 139,520 m2 of solar panels on ground mounted steel frames within a site area of 46.3 hectares; a fenced electricity substation compound to include 1 no. electricity control building and hardstands for ancillary electrical equipment; 12 no. inverter/transformer stations; underground cable and ducts; internal access tracks and hardstanding areas; boundary security fence; CCTV and all associated site services and works, 2 no. new site access points from the public road, one for construction / decommissioning traffic purposes only, and one for operational traffic. Amendments proposed are optimised Solar PV Panel configuration located within the same areas of the site as previously permitted with the exception of a reduced buffer distance under the existing 110Kv lines from c.56m to c.46 m to comprise up to 252000 square meters of solar panels to allow for solar panel array height increase from up to 2.8m to 3.2m. Modifications and enlargement to the onsite substation and substation compound. The substation will increase in size from c.55 m2 as permitted to c.150 m2 and the substation compound will increase in size from c.700 m2 as permitted to c.1081 m2. Omission of 2 no. inverter/transformer hard standing areas and minor changes of position of hardstanding from the permitted solar development to allow for a total of 10 hardstanding areas which will provide the base for 20 no. inverter and transformer units housed in sound pression containers, Permission is also sought to amend the life span of the consented development from 25 years to 30 years. / 0.8 km away / 21 September 2020Granted
- 176239The development will consist of a ground mounted solar photovoltaic (PV) farm consisting of the following; up to an area of 139,520 m2 of solar panels on ground mounted steel frames within a site area of 46.3 hectares; a fenced electricity substation compound to include 1 no. electricity control building and hardstands for ancillary electrical equipment; 12 no. inverter/transformer stations; underground cable and ducts; internal access tracks and hardstanding areas; boundary security fence; CCTV and all associated site services and works, 2 no. new site access points from the public road, one for construction/decommissioning traffic purposes only, and one for operational traffic. Permission is sought for a period of 10 years / 0.8 km away / 12 February 2018Granted
- 17622410 year permission, the development will consist of a proposed 4.392MW extension to a planning approval solar farm (ref 17/6028). The proposed extension will comprise of photovoltaic panels on ground mounted frames with associated infrastructure including 2 no invertor cabins, temporary construction compound, ducting and electrical cabling, perimeter agricultural fencing, mounted CCTV cameras and internal access tracks. / 0.9 km away / 22 February 2018Granted
- 22462Retain the storey and a half domestic extension (66.6 sq m) located at the side of the dwelling originally granted under planning ref: 06/5092. Retention permission is also sought for the store shed (50 sq m) located to the rear of the dwelling and associated site works / 1.1 km away / 10 January 2023Granted
- 1862155 year permission for the construction of an Energy Storage Facility comprising battery containers and associated infrastructure including combined power conversion systems, grid connection compound, electrical substation, transformers and grid compliance equipment, temporary construction compound, ducting and electrical cabling, fencing, CCTV cameras, landscaping and access tracks. / 1.1 km away / 04 September 2018Granted