191322: Single storey 710 sqm industrial unit, comprising of a 236 sqm metal fabrication workshop, and 474 sqm trade sales and display area, plus 272 sqm concrete surfaced yard with security fence to the side of the proposed building, connect into the existing mains sewer and storm water systems, to provide car parking, a 3.5m high sign at the site entrance and all additional site works
Kish Business Park, Clogga Road, Arklow
DecisionConditional grant
Decided06 February 2020
Application typePERMISSION
Source documents4
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Wicklow is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Chief Executives OrderSource: wicklowcoco.eplanning.ie / D2b26b54-30d9-40bb-b625-b396d327fb16.pdf / Document 329873Source PDF
- Final GrantSource: wicklowcoco.eplanning.ie / 930d3f69-9917-4590-97ec-34adeb44c1b5.pdf / Document 334200Source PDF
- Planners ReportSource: wicklowcoco.eplanning.ie / 0009c0ea-d626-4370-936b-7c57ee057db5.pdf / Document 329876Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 2460614Saw enclosure(Gross Area 145 Sqm) to end of Unit 2 and all associated site works / 0.1 km away / 26 November 2024Granted
- 17941Single storey industrial unit (gross area 1523 sqm) for timber storage, revised parking layout and all associated site works and RETENTION of revised layout to eastern gable doors to existing building and boundary fence treatment / 0.1 km away / 19 October 2017Granted
- 21951(i) Single storey industrial unit (Gross area 3150 Sqm) infill extension between existing buildings. (ii) New car park and timber storage compound (0.7 Ha) and all associated site works / 0.1 km away / 12 January 2022Granted
- 22243(i) Single storey industrial unit (Gross Area 2,380sqm) in lieu of that allowed under PPR21/951 and (ii) new car park and timber storage compound and all associated site works / 0.1 km away / 05 May 2022Granted
- 18128356 sqm of existing first floor office and external window and full permission for office (gross area 120 sqm) and windows at second floor, new fire escape at ground floor, additional parking and all associated site works / 0.1 km away / 15 January 2019Granted
- 21677Construction of Biofuel facility comprising of a part 3 storey and part single storey commercial building with a total floor area of 1771m2, covered truck filling / unloading area. Pipe bridge and tank farm storage area. The overall building height is 14 metres with solar panels on the roof. The maximum height of any storage tank is 12 metres and the boiler room chimney is 15 metres. Extension of the existing Kish Business Park access road, footpaths, drainage and water supply to serve the subject site. New internal roads, footpaths, 21 no. car parking spaces, 10 no. cycle parking spaces and parking and circulation areas for 10 no. trucks; 2 no. vehicular entrances, pedestrian access, boundary treatment and landscaping, ESB substation and new underground foul and storm water drainage system for the site including rainwater harvesting, attenuation pond, full retention oil interceptor and associated works. The application site area is 1.6 hectares. An Environment Impact Assessment Report (EIAR) has been prepared and will be submitted to the Planning Authority with the planning application / 0.2 km away / 15 November 2021Granted
- 2460253Single storey industrial unit (Gross Area 945 Sqm) and all associated site works / 0.2 km away / 19 June 2024Granted
- 18711Single storey industrial unit (Gross Area 1513sqm) comprising 6 individual units for light industrial and warehousing use, 35no carparking spaces, truck unloading bay, connection to existing services and all associated site works / 0.3 km away / 06 March 2019Granted