19158: Demolition of existing stand along single storey shelter / storage structure to side (floor area: 31 sqm) and the construction of a new single storey 2 no classroom special education unit to side / rear (total floor area of proposed extension: 320 sqm) of existing single storey school building (total floor area of existing school building: 611 sqm), minor elevational amendments and all associated site works
Tinahely National School, School Road, Tinahely
DecisionConditional grant
Decided08 April 2019
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Wicklow is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 18901Circa 107 sqm single storey extension to the front of the existing Community Hall which will provide a new accessible entrance, covered porch and entrance area, kitchen, stores and new toilets. Relocation of existing stairs and minor amendments to internal layout on upper floor to reconfigure existing office space, amendments to elevations, including replacement of existing roof and all associated site works / 0.1 km away / 26 September 2018Granted
- 17193To construct new entrance, proposed disability access to existing football grounds and perimeter fencing with all assocaited site works / 0.1 km away / 19 October 2017Granted
- 23697Erect flood lights around existing GAA pitch and all associated site works / 0.1 km away / 20 October 2023Granted
- 201271Single storey extension to side and rear of existing dwelling house including drainage and ancillary works / 0.2 km away / 08 February 2021Granted
- 171080Two storey extension to an existing dwelling including all ancillary site works / 0.2 km away / 12 December 2017Granted
- 182862 no storage warehouses with all ancillary services and associated works / 0.3 km away / 09 May 2018Granted
- 2460087A 10-year planning permission for a proposed development that consists of the part demolition, extension, reconfiguration, and refurbishment of an existing production and manufacturing facility. The proposed development includes for: Partial demolition of the existing facility, warehouses and storage shed, and excavation and site clearance at the rear of the site to facilitate the proposed works. Removal of existing ESB substation. The construction of production area; cleanrooms; a whiteroom; QC lab; plant areas, warehouse, workshops, ancillary offices, reception, canteen, and staff facilities and amenities within the existing areas to be refurbished and extension to the facility. There will be an overall gross floor area increase of c. 3,578 sq.m. Provision of sprinkler tank and pump house; storage silos; an ESB substation (including ESB equipment, MV switchgear and transformer) and the relocation of a generator. The reconfiguration of existing car parking and proposed additional parking resulting in 113 no. car spaces overall (including 5 no. disability spaces and 5 no. EV spaces). Provision of 2 no. bikes stores for 40 no. bicycle storage spaces. Truck loading bays and turning yard. Landscaping (including resurfacing of the existing access to the Tinahely Recycling Centre); boundary treatments and SUDs measures. External site lighting. Provision of solar PV panels at roof level and signage to the building facades. All associated and ancillary works and services necessary to facilitate the construction and operation of the proposed development. This planning application will be accompanied by a Natura Impact Statement (NIS) / 0.3 km away / 25 October 2024Granted
- 24605491) The moving out of the front door from the recessed position as built to line with the front walls on either side. 2) Construct a new wall under the bay window to the front elevation that follows the profile of the windows. 3) The roofing in of the area created by moving the door. 4) Construction of floor to the new space / 0.3 km away / 31 October 2024Granted