The Dowery, Manor Kilbride, Blessington
Planning application 201268
DecisionConditional grant
Decided22 April 2021
Application typeRETENTION
Source documents6
Site
What is on file
0refusal reasons6conditions8nearby records
Proposed development
Application description published by Wicklow County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
No refusal reason is on record for this application yet.
Conditions
- 1Permission refers to development as described in documents lodged as revised on 22/03/2021.Compliance
- 2Developer shall pay €1,905.20 to the Planning Authority for public infrastructure and facilities.Development Contribution
- 3Effluent disposal system must be built to EPA 2009 Code of Practice standards. Photographic evidence and a compliance certificate from a chartered Engineer, EHO, or Hydrogeologist must be submitted on completion.Wastewater Drainage
- 4Existing septic tank shall be removed or backfilled with inert material.Wastewater Drainage
- 5Dwelling and extensions must be jointly occupied as a single housing unit. No separate sale, letting, or conveyance of the extension.Occupancy
- 6Garage for private domestic use only. No human habitation or commercial purpose.Occupancy
Planning a project near The Dowery, Manor Kilbride, Blessington?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Inside the decision file
Extracts from the council's own decision documents for this application — 13 pages of searchable text on file.Chief Executives Order1 page indexed
CKL COUN o 00 as amended Director of Services Order No: 666t2021 Reference Number y! 20n268 nl O Name of Applicant: John Scanlon Address: es c/o CGA Consultant Engineers Ltd l6 South Main Street os Naas Co. Kildare rp Pu Nature of Application RETENTION for A. Construction of sunroom to g the south west gable. B....
Final Grant1 page indexed
Cocnbntnle Coocne g>ttt cy>bnncAIn Aras An Chontae / County Buildings ((lfsKlotrr CouncU Coupsll Cill Mhantdin / Wicklow Guthdn / Tel: (O4Aq 2Ot4B Faics / Fax: (0404) 69,162 Forbaift Pleanila agus Comhshaol Rphost / Email: plandev@wicklowcoc< Suiomh / Website: www.wicklow.ie Planning Development and Environment .t 8O...
Planners Report4 pages indexed
Planners Report- HOC PRR: 2011268 WICKLOW COUNTY COUNCIL PLANNING DEPARTMENT PLANNING REPORT TO: FERGAL KEOGH S.E. / EDEL BERMINGHAM S.E.P y! FROM: HOLLY O'CONNOR AP nl SUBJECT REF: 2011.268 O NAME: JOHN SCANLON es DEVELOPMENT: RETENTION OF CONSTRUCTION OF SUNROOM TO THE SOUTH WEST GABLE. B. CONSTRUCTION OF GARAGE AND...
Read the full decision filePro members can search and read every indexed page of this file with the AI research assistant — planner's reasoning, conditions, and precedent across 5 documents.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Chief Executives OrderSource: wicklowcoco.eplanning.ie / Fc48e933-2632-480c-8d18-2700b67f2ab8.pdf / Document 383991Source PDF
- Final GrantSource: wicklowcoco.eplanning.ie / 2e7358f4-284f-4737-ad6e-9a77cd386a7e.pdf / Document 390995Source PDF
- Planners ReportSource: wicklowcoco.eplanning.ie / Bb6c0968-d86b-423e-bd40-5f2f046a257c.pdf / Document 383994Source PDF
- Planners ReportSource: wicklowcoco.eplanning.ie / C6abcf6b-3e1d-4980-b690-3dcd3a9be954.pdf / Document 383995Source PDF
- F I Request LetterSource: wicklowcoco.eplanning.ie / 44df4fe4-de74-4f49-b4be-091bae107dce.pdf / Document 372684Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 2460289The construction of a sun-room extension at the side of the house, a rooflight in the main roof to the front of the house, a home gym / office in the rear garden and repositioning of the previously approved vehicular entrance and driveway from the eastern boundary to the western boundary / 0.2 km away / 06 January 2025Granted
- 171304Minor elevational alterations to existing dwelling. Permission is also sought for the upgrade of existing effluent disposal system to current EPA standards together with all ancillary site works / 0.2 km away / 04 December 2017Granted
- 24601091.Full planning permission to upgrade existing septic tank system to treatment plant and soil polishing filter along with 2. Retention permission for sheds to rear of dwelling and all associated site works / 0.3 km away / 31 October 2024Granted
- 224851.Retention for stone and brick finish to front and side elevation along with double door to rear, 2. retention for single storey garage to side of existing dwelling and 3. retention for conversion of attic to storage room with 2 number velux windows to the front and two number gable windows / 0.3 km away / 10 January 2023Granted
- 181153Dormer bungalow with septic tank and percolation area along with new entrance / 0.7 km away / 04 July 2019Granted
- 24216A porch extension to front, demolition of a 63.65sqm conservatory to rear, building a single storey 71.72sqm extension to rear; extending existing roof line over kitchen/dining on front elevation; extending rear roof line from ridge to new extension; internal changes and upgrading existing sewerage treatment system together with all ancillary works / 0.9 km away / 03 July 2024Granted
- 20557Detached single storey dwelling, new recessed site entrance, on site domestic wastewater treatment system, landscaping and all associated site development works / 1.1 km away / 06 November 2020Granted
- 201011Single storey dwelling, domestic garage, a wastewater treatment system, new entrance and all ancillary works / 1.1 km away / 12 March 2021Granted