20326: A) construction of a single storey extension to north side of the house of 33m.sq. comprising of home office and extended storage area b) rise of a section of north boundary wall by ca. 750mm to 2300mm height along the newly constructed extension, and c) all associated site works
19 Seapoint Court, Bray, Co. Wicklow
DecisionConditional grant
Decided03 July 2020
Application typeRETENTION
Source documents4
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Wicklow has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Chief Executives OrderSource: wicklowcoco.eplanning.ie / 91c5b0ec-5738-4781-8fc0-90a16284b8ea.pdf / Document 345033Source PDF
- Final GrantSource: wicklowcoco.eplanning.ie / Dd4a6ff8-4034-4813-8b1b-49490787f777.pdf / Document 349960Source PDF
- Planners ReportSource: wicklowcoco.eplanning.ie / A97d510e-1481-419b-b398-5a4b66d02607.pdf / Document 345036Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 211425One and two storey extension to an existing dwelling including all ancillary site works / 0.0 km away / 26 January 2022Conditional grant
- 2660235Single storey extension to side and rear / 0.1 km away / 15 May 2026Conditional grant
- 2660222Attic conversion with dormer to rear and gable window to side with all associated ancillary works / 0.1 km away / 13 May 2026Conditional grant
- 22188Demolition of 4 light industrial/commercial buildings including their extensions, change of use from light industrial/commercial to residential use, and the construction of a total of 54 no. apartment units across 2 no. blocks comprising: Block A consisting of 4 storeys with setback 5th storey (5 storeys overall), all over undercroft parking and providing 14 no 1 bed units and 17 no. 2 bed units, with a 220sqm communal terrace located above the 4th storey; and Block B consisting of 3 storeys with a setback 4th storey(4 storey overall), all over undercroft parking providing 9 no. 1 bed units and 14 no. 2 bed units. The development will also include: private open spaces in the form of balconies and terraces; 193 sqm public open space and associated play areas and landscape works; roof mounted solar photovoltaic panels; 36 no. undercroft car parking spaces and 1 no. disabled parking space at surface; 85 no. resident bicycle spaces and 28 no. visitor bicycle spaces; upgraded vehicular access from Seapoint Road and all ancillary utilities, plant and bin stores, boundary treatments and associated site development works. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the planning application / 0.1 km away / 04 October 2022Conditional grant
- 2272The construction of side and rear single storey extension with pitched roof and a new porch with hipped roof. To construct the front garden low wall with sliding gate. Internal alterations and all ancillary site works / 0.1 km away / 16 March 2022Conditional grant
- 2561056(A) the replacement of an existing door with new glazed door. (B) lowering the height of the two existing cills and provision of two new sash windows in revised window opes. (C) the provision of a new matching sash window in the existing door ope. (D) the provision of a new matching sash window in existing door ope. (E) the provision of a new matching sash window. (F) the reuse of two existing sash windows in new window opes to first floor. (G) the widening of existing vehicular entrance gate / 0.1 km away / 18 February 2026Conditional grant
- 191121Demolition of existing rear ground floor extension and erection of new rear ground floor extension. Permission is also sought for revisions to rear elevation, to include new door and balcony, at first floor level and all associated site works / 0.1 km away / 29 November 2019Conditional grant
- 22586For a scaffold / 0.1 km away / 06 July 2022Conditional grant