211335: Construction of a bungalow with garage and car port, new entrance and access driveway, new treatment system and percolation area to current EPA standards and all ancillary site works
Johnstown South, Arklow, Co. W icklow
DecisionConditional grant
Decided04 March 2022
Application typePERMISSION
Source documents6
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Wicklow has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Chief Executives OrderSource: wicklowcoco.eplanning.ie / Cdea8a74-fbc5-4a22-b74b-3b494538aa2e.pdf / Document 429363Source PDF
- Final GrantSource: wicklowcoco.eplanning.ie / 55d1e708-888c-461e-83aa-87402e20b7be.pdf / Document 433841Source PDF
- Planners ReportSource: wicklowcoco.eplanning.ie / 728848e6-0fa6-4d7f-83c8-182ff32ccae7.pdf / Document 429367Source PDF
- Planners ReportSource: wicklowcoco.eplanning.ie / 43f8174b-b6ce-4d78-9413-0fb32ae13b92.pdf / Document 429368Source PDF
- F I Request LetterSource: wicklowcoco.eplanning.ie / 898027df-fa30-43f2-aa8d-427ba976bf37.pdf / Document 420459Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 2560271Construction of a bungalow with garage, a new entrance, a new treatment system and percolation area to current EPA standards and all ancillary site works / 0.2 km away / 25 September 2025Granted
- 171497Solar farm within a site area of approximately 39 hectares consisting of solar photovoltaic panels covering an area of up to 27.2 ha on ground mounted steel frames, 1 no on site substation, 8 no inverter / transformer stations, underground cables and ducts, boundary security fence, new internal tracks, CCTV cameras and all associated site services. Permission is sought for a period of 10 years / 0.7 km away / 02 May 2018Granted
- 2360151A 38KV grid connection cable and associated infrastructure to connect the approved Johnstown North solar farm (consented under planning ref. 171497) to the existing Arklow 220kV Substation comprising the laying of a 3,190m Underground Cabling (UGC) and associated infrastructure, located at Dublin Road, Arklow, Co. Wicklow / 0.7 km away / 20 March 2024Granted
- 21968Single storey dwelling and domestic garage with a waste water treatment unit and percolation area to current EPA specifications, plus bored well, together with all associated site works / 0.8 km away / 02 December 2021Granted
- 2360185To amend the design of the approved development (Planning Reference: 17/1497) which comprises a Solar PV Energy Development. Proposed amendments include (1) change in location and size of substation, (2) two additional temporary construction compounds will be located at the site entrances, (3) the number of modules will decrease, (4) the number of pile driven poles will decrease, (5) the size and number of transformer stations will increase, (6) the total fencing area will increase (7) the total amount of fencing posts will increase, (8) up to 21 CCTV cameras will be installed (9) access tracks will be optimised and increased in width and length, and (10) increase in operational lifetime from 25 years to 35years / 0.8 km away / 16 April 2024Granted
- 19627Solar farm within a site area of approx. 19 ha consisting of solar photovoltaic panels covering an area of up to 9.8 ha on ground mounted steel frames, 1 no on site substation, 3 no inverter / transformer stations, underground cables and ducts, boundary security fence, new internal tracks, CCTV cameras and all associated site services. Permission is sought for a period of 10 years / 0.9 km away / 01 August 2019Granted
- 2560313Amend the design of the approved development (Planning Reference: 19/627 and ABP-305289-19) which comprises consent for a Solar Farm within a site area of 19 hectares consisting of solar photovoltaic panels covering an area of up to 9.8ha on ground mounted steel frames, 1 no. on-site substation; 3 no. inverter/transformer stations, underground cables and ducts, boundary security fence, new internal tracks, CCTV cameras and all associated site services within the townland of Ballymoney, near Arklow, Co. Wicklow. Planning permission was sought for a period of 10 years. Proposed amendments include (1) relocation of part of the internal access track, and (2) a gate will be added along the access track / 1.1 km away / 12 June 2025Granted
- 221172Erection of a front porch, replace existing flat roof on rear of existing dwelling with pitched roof married into existing pitched roof by raising the height of the existing pitched roof by 800mm, to remove existing chimneys, install a solar panel on the new south facing roof, and to replace existing flat roof on existing shed/domestic garage to rear of existing dwelling with a pitched roof, together with all associated site works / 1.2 km away / 16 December 2022Granted