211427: Dwelling,garage, upgrade to existing entrance, bored well, effluent disposal systems to current EPA standards and all associated site works
Ballyduff North, Johnstown Road, Arklow
DecisionRefused
Decided28 July 2022
Application typePERMISSION
Source documents3
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
Refusal reasons not machine-readable
Documents are indexed. Reason extraction for Wicklow is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Chief Executives OrderSource: wicklowcoco.eplanning.ie / C93cadd9-47de-4194-9051-5c6a0a65af4e.pdf / Document 450452Source PDF
- Planners ReportSource: wicklowcoco.eplanning.ie / 6f564472-367f-4afd-b069-46be45629356.pdf / Document 425029Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 2560244Construction of 3 no. digesters, 2 no. digestate storage structures, a liquid feed tank and 4 no. pump houses located in the northern section of the site. 4 no. pasteurisation tanks, a post pasteurisation cooling tank and a pre fertiliser manufacturing tank, located to the southeast of the digesters, in the centre of site. Part single-storey and part two-storey reception hall to accommodate a lab, panel room, tool store, workshop, and storage areas, with a liquid feed intake adjacent to reception hall, located at centre of site. Single-storey solid digestate storage & nutrient recovery building located to east of reception hall, in central portion of site. Odour abatement plant and all assoc. works. Construction of ESB substation, fuel storage tank, CNG compression unit, 2 no. CO2 tanks, CO2 loading pump, CO2 auxiliaries, CO2 liqueufactor, CO2 compressor, GFA, CO2 pre-treatment skid located in eastern portion of site. Construction of emergency biogas flare, biogas treatment skid, biogas compression system, biogas upgrading module, combined heat&power unit & panel room & H2S washing tower located in eastern part of site. Construction of grid offtake skid, biomethane boiler, grid injection unit & 2 no. propane tanks located to southeast of CO2 structures, in eastern section of site. Construction of two-storey office&admin building, located in southeast of site, adjacent to main site entrance. Associated works inc. parking, 3 no. EV, 1 no. accessible parking spaces;bike storage, access arrangements incl. new access point to site from adjacent road to south, weighbridge, provision of solar panels, wwt equipment, attenuation pond in northern portion of site, boundary treatments, lighting, services, lightning protection masts, drainage, landscaping & all assoc & ancillary works. EIAR submitted. / 1.2 km away / 28 May 2025Refused
- 23796(A) Erect 21No. dwelling houses, consisting of 6No. 3-bedroom dwellings (House type A1), 1No. 3-bedroom dwellings (House type A2), 8No. 3-bedroom dwellings (House type B1 & B3 ) and 6No. 2-bedroom dwellings (House type B2), (B) Provision of vehicular and pedestrian access off existing Emyvale Estate Road, (C) Provision of off street car parking facilities, (D) Ancillary site works and connection to existing services / 1.2 km away / 15 December 2023Refused
- 2384595 dwellings comprising 71 no. semi-detached and terrace houses with 2,3 and 4 bedrooms together with 24 apartments in 6 blocks and Creche. The development includes provision of open spaces, roads, footpaths, connection to services and all associated ancillary site development works / 1.2 km away / 16 January 2024Refused
- 18552Erect a finger post sign for Wicklow Calf Company / 1.5 km away / 09 July 2018Refused
- 18553Erect a finger post sign for Wicklow Calf Company / 1.8 km away / 09 July 2018Refused
- 221047Retain attic conversion to habitable rooms including velux roof lights to front and rear of property and associated site works / 1.8 km away / 16 November 2022Refused
- 221387Demolition of the existing structure to the north of the site, (c.62.5sq.m) and the construction of 49 no. 2 storey residential units comprising of 6 no. 4 bed semi detached houses (c.130sq.m each), 25 no. 3 bed semi-detached/terraced houses (c112sq.m each), 14 no. 2 bed semi-detached/terraced houses (c.85sq.m each), 2 no 1 bed ground floor apartments (c.52sq.m each) and 2 no. 1 bed first floor apartments (c53sq.m each). A total of 91 car parking spaces are proposed which includes 5 no. accessible car parking spaces, 3 no. EV car parking spaces and 3 no. visitor spaces. Bicycle parking to the rear of each unit. 1 no. ESB substation is proposed to serve the development. In total the proposal provides for 2,879sq.m of public open space through 3 no. areas throughout the site. Waste water connection will be provided via the private waste water treatment plant at the existing Heatherside development to the west.. All associated site works, service provisions, drainage works, vehicular access to the north west from the existing Heatherside Residential Development (under construction), all internal roads and footpaths, bin stores, landscaping, boundary treatment works and public lighting serving the proposed development. / 1.9 km away / 15 December 2023Refused
- 22583For a dwelling, garage, well, effluent treatment system, upgrading existing entrance & provision of a driveway & associated works. The site is accessed via existing right of way. / 1.9 km away / 22 July 2022Refused