Rear of St. Gerards, Putland Road, Bray
Planning application 21511
DecisionUnconditional grant
Decided17 June 2021
Application typeEXTENSION OF DURATION
Source documents3
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Wicklow County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
No refusal reason is on record for this application yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Rear of St. Gerards, Putland Road, Bray?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Inside the decision file
Extracts from the council's own decision documents for this application — 5 pages of searchable text on file.Chief Executives Order1 page indexed
WICKLOW COUNTY COUNCIL PLANNING & DEVELOPMENT ACTS 2000 (as amended) Director of Services Order No: lO5Ol2OZl y! Reference Number: nl 2ll51l O Name of Applicant Clare-Ann Temple & Tommy Slattery es Address: St. Gerards Putland Road os Bray rp Co. Wicklow Pu Nature of Application: EXTENSION OF APPROPRIATE pEzuOD for...
Planners Report4 pages indexed
PRR21/s11 y! nl WICKLOW COUNTY COUNCIL O Planning Department PRR 2Llstt es NAME CIare-Ann Temple & Tommy Slattery os DEVELOPMENT Application under Section 42 of the Planning and Development Act 2000, as amended, to extend the appropriate period of planning permission rp Register Reference t6l 444l' Construction of a...
Read the full decision filePro members can search and read every indexed page of this file with the AI research assistant — planner's reasoning, conditions, and precedent across 2 documents.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Chief Executives OrderSource: wicklowcoco.eplanning.ie / E5876de8-e2b4-46e4-8688-c3fa671de230.pdf / Document 393016Source PDF
- Planners ReportSource: wicklowcoco.eplanning.ie / Aea4f202-40ce-4534-815f-88ef1bb64e35.pdf / Document 393018Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 2360465Single storey rear extension and frosted window in side gable at first floor of existing dwelling / 0.0 km away / 31 January 2024Granted
- 211139Two storey rear extension including alterations to the existing dwelling, redesign of the front garden to provide additional carpark spaces and associated site works / 0.1 km away / 04 November 2021Granted
- 17774Formation of part single storey and part two storey extension to rear with kitchen / dining area at ground floor level and bedroom over (2) formation of extension at first floor level over existing garage and kitchen comprising bedroom, bathroom, and wardrobe to side of house (3) formation of shower room in existing garage, with access from hall, and two storey extension to front of house comprising extension of entrance hallway and bedroom over (4) internal alterations (5) associated site works / 0.1 km away / 17 August 2017Granted
- 2660146Existing sunroom extension (15.6m²) and existing raised decking area (23m²), both to the rear of existing two storey semi detached dwelling / 0.1 km away / 20 April 2026Granted
- 2622Rear single and two storey extension, boiler house to the side of dwelling and associated works / 0.1 km away / 18 March 2026Granted
- 22671The demolition of a single storey conservatory to the rear and the construction of a part single and part two storey extension to the rear and to the side, and all ancillary works / 0.1 km away / 08 August 2022Granted
- 2660161(a) the construction of a 2-storey dormer bungalow comprising 4 no. bedrooms with a gross internal area of 221 sq.m, located to the rear of the existing residential property; (b) a new vehicular and pedestrian access point off Putland Road to serve the new dwelling; (c) a new driveway to the dwelling with two car parking spaces; (d) the demolition of an existing shed and garden wall; (e) a new boundary fence to subdivide the property; and (f) all associated site development works / 0.1 km away / 10 June 2026Granted
- 23802First floor extension to side over existing ground floor portion / 0.1 km away / 14 December 2023Granted