23464: New four bedroom, part single, part two-storey dwelling house; detached garage; upgraded vehicular entrance on to public road and access driveway; new waste water treatment system and soil polishing filter and all associated landscaping works
Rosnastraw, Tinahely, Co Wicklow
DecisionConditional grant
Decided04 August 2023
Application typePERMISSION CONSEQUENT
Source documents7
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Wicklow has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Notification Of DecisionSource: wicklowcoco.eplanning.ie / 8b09dfd5-d15a-45d2-832a-d79ed9b8c27a.pdf / Document 502327Source PDF
- Chief Executives OrderSource: wicklowcoco.eplanning.ie / Dc610737-2887-4b4f-a8eb-c0a2a022c3c5.pdf / Document 502326Source PDF
- Final GrantSource: wicklowcoco.eplanning.ie / B73ab59f-6f84-41cf-9bdf-fa90ab8afc9c.pdf / Document 511494Source PDF
- Planners ReportSource: wicklowcoco.eplanning.ie / A5d10679-c510-4526-90c1-e0ff6c75ed87.pdf / Document 502329Source PDF
- Planners ReportSource: wicklowcoco.eplanning.ie / 6eea9f4a-78cb-4163-b358-4ad6a2f26fb8.pdf / Document 502330Source PDF
- F I Request LetterSource: wicklowcoco.eplanning.ie / F0a5082b-151f-44a5-bb58-c0a781f9aee9.pdf / Document 496595Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 22703Proposed detached dormer dwelling & detached garage together with ancillary site development works including screen planting, effluent disposal system to current EPA standards and access driveway & vehicular entrance onto public road / 0.0 km away / 15 August 2022Granted
- 211399Demolition of existing dwelling on site, a proposed new dwelling, garage / car port, new well, a proposed secondary treatment system with percolation area to current EPA guidelines, new entrance and all associated site works / 0.4 km away / 01 June 2022Granted
- 2560532A) construction of milking parlour, collecting yard, animal handling facilities & underground slatted tank. B) erection of meal bin. C) 2 roadside entrances for crossing cows across the L6204 and all associated site works / 0.8 km away / 04 September 2025Granted
- 211731 no. agricultural slatted unit of 67.5sqm with underground effluent storage tank, for the housing of cattle. The structure is mono-pitched with a maximum height of 4m and the effluent storage tank is 2.4m (8ft) deep. The shed is constructed of poured concrete base and rising walls, rolled steel joist (RSJ) beams and galvanised sheet cladding / 0.9 km away / 12 April 2021Granted
- 191046Single storey porch to front of existing dwelling and RETENTION permission of 1. conservatory and games room to rear of dwelling 2. domestic garage as constructed (variations from garage as granted permission under planning permission reference 99/1078) 3. domestic shed as constructed 4. garden shed as constructed / 0.9 km away / 05 February 2020Granted
- 19562Dwelling house with services, domestic garage and all associated works / 0.9 km away / 05 November 2019Granted
- 23202To construct 1) a part single storey, part storey and a half type dwelling. 2) to install a septic tank and percolation area. 3) construct a bored well. 4) permanently close off the existing agricultural entrance and open a new domestic type vehicular entrance. 5) All ancillary groundworks associated with the above / 1.1 km away / 25 April 2023Granted
- 22621(1) make alterations to and erect an extension to existing dwelling (2) demolish existing domestic garage and erect a domestic garage as replacement (3) permission to upgrade existing wastewater treatment facilities and all associated site and ancillary works / 1.4 km away / 27 July 2022Granted