25119: Erect a two-bedroom dwelling (maisonette), over the Aughrim Butcher Shop. The 99.17 square meter maisonette has its main entrance through the rear gate and yard (private open space) beside and in line with the adjoining existing development entrances. Permission is also required for any ancillary site works including but not limited to, sewage, water, rear yard paving and car parking
Aughrim Deli, Main Street, Aughrim
DecisionRefused
Decided03 July 2025
Application typePERMISSION
Source documents4
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
Refusal reasons not machine-readable
Documents are indexed. Reason extraction for Wicklow has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Notification Of DecisionSource: wicklowcoco.eplanning.ie / 220ab3eb-b461-4a72-b8f5-6afdc9c66c2a.pdf / Document 636082Source PDF
- Chief Executives OrderSource: wicklowcoco.eplanning.ie / 3eab73f7-8e64-4808-b52f-e7a2f3df81c6.pdf / Document 636081Source PDF
- Planners ReportSource: wicklowcoco.eplanning.ie / Ef4a138e-df1b-4bca-8b69-0f9613d5cdb4.pdf / Document 636083Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 172402 storey detached dwelling, connections to public services formation of new entrance with all associated site works / 0.1 km away / 02 May 2017Refused
- 1982 no detached dwellings, provision of 6 no car parking spaces, connection to existing services and associated works / 0.1 km away / 25 February 2019Refused
- 23181. Divide the property into two separate dwellings. 2. Permission to provide connections to existing services for the proposed dwelling. 3. Retention for the demolition of boundary wall and relocation of side entrance gate. 4. Retention for constructed boundary wall separating both properties. 5. Retention for carparking area, access pathway and pedestrian entrance / 0.1 km away / 03 March 2023Refused
- 22808Restoration, refurbishment and extension / 0.4 km away / 09 September 2022Refused
- 2460374Demolition of existing building on site, a new dwelling, connection to public services, new entrance onto driveway which leads to public road, moving of existing wall and gates which leads to neighbouring dwelling and associate works / 0.5 km away / 07 February 2025Refused
- 17124Extension to an existing outbuilding and to convert its use from incidental to the enjoyment of the residence to an ancillary dwelling unit in conjunction with the main residence to accommodate housing requirements of a single household of three generations on the site with an area of 0.21 ha and to relocate a bedroom window in the front elevation of the existing residence to the side elevation / 1.7 km away / 27 March 2017Refused
- 2560466Construction of a new dwelling, new access, installation of a wastewater treatment system and percolation area, new well and all associated site works / 1.8 km away / 15 August 2025Refused
- 17814Ten year permission for development of a wind energy project. The development will consist of up to eleven wind turbines with a maximum overall height of 150m to blade tip from existing ground level, a transformer at each turbine, a hard stand area adjacent to each turbine, a 38kV electrical substation and all associated infrastructure and works, up to two permanent / temporary meteoroligcal mast with a maximum overall height of 100m tip from existing ground level and all associated infrastructure and works, a temporary site compound and all associated works, new site tracks and upgraded site tracks and all associated works, two new access entrance to local road and all associated works, 20kV underground cables facilitating the connection of turbines to 38kV electrical substation and all associated infrastructure and works, land clearance including tree felling and vegetation removal, and all ancillary works. An Environmental Impact Statement accompanies the application / 2.2 km away / 28 August 2017Refused