Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Roadford , Doolin , Co Clare

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

11% of nearby decided applications were refused. The preview found 177 nearby planning records within 5 km where a location match is available.

Matched source
19198
Project type
One-off house
Coverage
5 km radius
177Nearby applications
11%Refused
158Conditional grants
0Refusal reasons

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest similar decisions

19198

To build a dwelling house, garage, install a waste treatment unit and all ancillary and site works.

Granted0.0 km10 October 2019
23111

For a new entrance and relocated boundary wall to facilitate the provision of a public footpath including ancillary ground-works

Granted0.1 km19 April 2023
19996

To convert the existing Public Restaurant and Lounge areas into a new Public Bar/Dining area and Public Bar/Lounge area along with associated internal alterations at the Fiddle and Bow Hotel

Granted0.1 km11 February 2020
24301

Of the outdoor canopy area, food/beverage container and toilet cubicle along with associated site works

Granted0.1 km05 November 2024
211216

Of the single storey rear extension, rear canopy, the outdoor seating area and the door to the front lobby area and PERMISSION to replace 3 windows with 3 doors on the front elevation

Granted0.1 km12 January 2022
19397

To construct pub, kitchen, toilets, storage area, apartment, parking area, waste water treatment system, new site entrance and associated site works

Granted0.2 km16 August 2019

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required