To construct a dwelling house and garage, with effluent treatment system, entrance from the public road, and all associated site works
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Rine , Tulla , Co Clare
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
7% of nearby decided applications were refused. The preview found 198 nearby planning records within 5 km where a location match is available.
- Matched source
- 21201
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
For variation of design on sites 25 to 36 inclusive and to increase the number of housing units from 12 to 19 of the granted planning permission P19/765. The application is to construct 4 No. 3 Bedroom Semi-Detached houses and 3 No. 3 Bedroom Terraced houses on sites 25 to 28 and to construct 12 No. 4 Bedroom Semi-Detached Houses on Sites 29 to 36 instead of the previously granted detached houses
To construct an extension to an existing dwelling. The development will consist of the demolition of existing sheds and extension, the construction of a new two storey extension, garage, treatment system, new site entrance and associated site works
To RETAIN 1) single storey extensions to the sides and rear of the property. 2) an outbuilding to the rear
For a variation of house designs, house nos. 6 to 36 inclusive, previously granted under Planning Ref: P19/765
To demolish existing dwelling house, and garage and to construct new dwelling house, garage, upgrade entrance and replace existing septic tank with new waste water treatment unit / percolation area along with all associated site works and services
Source match
Matched from public planning record 21201The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report