The construction of a single storey timber cabin to be used as an activity room, in conjunction with our existing Early Learning and Care Centre, and all associate site works
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
57 Milford Park , Balllinabrannagh , Co. Carlow
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
4% of nearby decided applications were refused. The preview found 160 nearby planning records within 5 km where a location match is available.
- Matched source
- 22245
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
The construction of an outdoor roofed play area, a storage shed and all associate site works.
Retention planning permission is sought to retain single storey extension with outdoor canopy over patio as constructed to the rear of existing dwelling, to retain dometic timber shed as erected to the rear of existing dwelling, to retain front boundary and amended site area as constructed to the front of the existing dwelling house from the original Pl Ref:PL 04/739 and amended under PL 06/88 and completed under Pl Ref: 16/278, all ancillary site works and services
Planning permission is sought for the construction of a proposed single storey sun lounge extension to the rear of an existing dormer dwelling, a proposed porch to the front of same, internal alterations to stairs and landing area, detached shed/storage to the rear and all associated works.
To retain single storey domestic garage to rear of existing dwelling with all associated ancillary works
For the construction of a single storey dwelling, new entrance, connection to services and all associated site works
Source match
Matched from public planning record 22245The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report