For alterations of previously approved plans. Ref: 20/403 to include increased floor area, elevation changes and all associated site development works
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Kingdom Hall of Jehovah's Witnesses , Church Lane Lisasturrin , Kingscourt Co. Cavan A82 VF59
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
5% of nearby decided applications were refused. The preview found 212 nearby planning records within 5 km where a location match is available.
- Matched source
- 237
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
Demolition of existing single storey place of worship, together with the construction of 1 no. single storey place of worship with external signage, connection to the existing services and associated site works
For scheme of external lighting for health & safety reasons
To construct 3 no. two storey detached dwellings with detached domestic garages, access roadway onto existing public laneway, footpaths, upgrade existing vehicular entrance onto public laneway, new vehicular entrance off proposed access roadway to existing dwelling, boundaries, landscaping, connection to existing public services and all associated site works
EXTENSION OF TIME 14/285 of alterations and conservation work to existing hall including the demolition of later extension and the construction of a new entrance porch, removal of stage, installation of kitchen and toilet facilities and installation of new window openings and ramp. St. Ernan's Hall is a protected structure
To construct single storey extension to rear of existing stationary shop/ post office and all associated site works
Source match
Matched from public planning record 237The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report