For Electrical Infrastructure Upgrade Works on the hospital campus which includes: 2no. new Substations. Substation Building 1 is located to the south west of the site and includes an associated compound and a containerised generator. Substation Building 2 is located to the north of the site and includes an associated compound and a containerised generator. In the location of Substation Building 2 works also include a new water tank, pumphouse, a new oil tank with associated fencing, and a gas compound containing 4no. gas tanks
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Cavan General Hospital , 2 R212 Lisdarn , Co. Cavan
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
6% of nearby decided applications were refused. The preview found 638 nearby planning records within 5 km where a location match is available.
- Matched source
- 2460077
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
For a 5,236 sq. m. three storey extension, with plant room at roof level, together with all necessary ancillary site works. The extension shall comprise of Emergency Department at Lower Ground Floor level, Endoscopy Unit and link corridor at Ground Floor Level, Inpatient Bed Ward at First Floor Level and Plant Room at Roof Level. It will also include the installation of Photovoltaic Panels on the roof of the existing hospital. The site works will include the provision of a carpark adjacent to the extension comprising 44 car spaces, 5 motorbike spaces and bicycle bay and a carpark comprising 150 parking spaces on the internal access road to the east of the extension
For the construction of a standalone bus shelter and all ancillary site development works
For the following works: change of use of existing laundry building to be used as a medical file store, to carry out alterations to existing building and undertake associated site works
- RED III - for the construction of a single storey geothermal plant building with an associated yard area including access stairs. The Geothermal plant building will house ground source heat pumps and will be connected by buried pipework to a series of geothermal boreholes located to the south of the existing hospital. This Geothermal Plant is set to serve the previously granted Cavan General Hospital extension planning application, Ref-2460276. The application includes all associated boundary treatments, landscaping, and site development works necessary to facilitate the installation and integration of the development within the hospital grounds
For (a) a single storey modular structure at first-floor level containing a laboratory (b) PERMISSION for the construction of an extension to this modular building comprising a further single storey modular structure at first floor level containing a new laboratory; connection to existing services, and all associated site development works
Source match
Matched from public planning record 2460077The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report