To decommission existing sewerage treatment unit and percolation area and install new sewerage treatment unit and percolation area
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Billis , Drumalee , Co. Cavan
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
6% of nearby decided applications were refused. The preview found 687 nearby planning records within 5 km where a location match is available.
- Matched source
- 2460453
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
For • RETENTION of a single storey extension to side of existing dwelling incorporating additional living accommodation and attached domestic garage with associated alterations to floor plans and elevations of previously approved application ref: 647245. • RETENTION of alterations to site layout, site boundaries, entrance and all ancillary works. PERMISSION is also sought for: • Alterations to site layout and site boundaries, new sewerage treatment unit and percolation area and all associated and ancillary works
Retain alterations of existing dwelling house and detached garage (approved under Pl. Ref No. 04/85) and all ancillary works at Billis, Cavan, H12 Y663.
To erect fully serviced extension to the side of existing dwelling, carryout internal alterations, associated alterations to elevations and all ancillary and associated works
To erect fully serviced dormer extension to rear of existing dwelling, convert existing attic, new front porch, demolish existing garage and store and erect new detached domestic garage and all ancillary works
The development will consist of the provision of a total of 134no. residential units along with provision of a crèche. Particulars of the development comprise as follows: (a) Site excavation works to facilitate the proposed development to include excavation and general site preparation works. (b) The provision of a total of 109no. residential dwellings which will consist of 6no. 1bed units, 39no. 2 bed units, 59no. 3 bed units and 5no. 4 bed units. The residential dwellings range in height from one to two storeys. (c) The provision of a total of 25no. duplex apartment units consisting of 15no.1 bed units and 10no. 2bed units. The duplex apartment units range in height from two to three storeys. (d) Provision of a single storey creche with associated parking, bicycle and bin storage. (e) Provision of associated car parking at surface level via a combination of in-curtilage parking for dwellings and via on-street parking for the creche and duplex apartment units. (f) Provision of electric vehicle charge points with associated site infrastructure ducting to provide charge points for residents throughout the site. (g) Provision of associated bicycle storage facilities at surface level throughout the site and bin storage facilities. (h)The provision of an internal culvert along with decommissioning of existing drainage channel within the site. Culvert works to include for provision of a headwall at the outfall to the watercourse. (i) Creation of a new access point from the public road with associated works to include for a connections to the existing public footpath along with a pedestrian crossing point. (j) Provision of internal access roads and footpaths and associated works to include for regrading of site levels as required. (k) Provision of residential communal open space and public open space areas to include formal play areas along with all hard and soft landscape works with public lighting, planting and boundary treatments to include boundary walls, railings & fencing. (l) Internal site works and attenuation systems which will include for provision of a hydrocarbon and silt interceptor prior to discharge. (m) All ancillary site development/construction works to facilitate foul, water and service networks for connection to the existing foul via a rising main and provision of a foul pumping station, water connections and ESB network connection to include for provision of a substation. A Natura Impact Statement (NIS) has been prepared
Source match
Matched from public planning record 2460453The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report