Amendments to part of the design of an approved solar farm development (Clare County Council Planning Reg. Ref. P23/60249). The proposed amendments comprise the erection of eight new pole sets and two new masts and replacement of two existing pole sets with two new masts; Placement of overhead lines (comprising 688m) to enable connection to the national grid; Placement of underground cables (comprising 91m) to enable connection from the overhead lines to the approved substation; Alterations to the design, layout and scale of the approved substation; Removal of solar panels (comprising 668sqm) adjacent to the substation; Removal of underground cable route (comprising 1,457m) and associated works for the cable route from the substation to the national grid at Ardnacrusha; and all other associated works
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Land to the west/north-west of Ardnacrusha , within the townlands of Castlebank , and Glenlon South.
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
9% of nearby decided applications were refused. The preview found 330 nearby planning records within 5 km where a location match is available.
- Matched source
- 2560563
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
For a dwelling house, access roadway and all associated site works
For a dwelling house, entrance and all associated site works
For modifications to the house design granted under P22/716 and all associated site works
For a dwelling house and all associated site works
For a Medical Centre and all associated site works
Source match
Matched from public planning record 2560563The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report