1) demolition of existing single storey Dwelling (with Bed & Breakfast use) and ancillary outbuilding/garage, and demolition of 5 no. vacant commercial buildings and associated site clearance; 2) renovation and change of use of existing (vacant formerly commercial use) single storey vernacular townhouse structure to Dublin Road (W91 HX74), part demolition of non-historic additions and construction of porch / canopy to rear, for office / commercial use (single level throughout) totalling c. 71 sqm; 3) construction of a part single part two storey mono roof pitch Discount Foodstore Supermarket with ancillary off-licence use measuring c. 2,305 sqm gross floor space with a net retail sales area of c. 1,499 sqm; 4) construction of a single storey Café unit measuring c. 140 sqm (with external seating area); 5) construction of a vehicular access point to the Dublin Road and associated works including associated modification of existing footpaths / public realm and associated and ancillary works including removal of existing access points to Dublin Road; and, 6) associated car parking (including electric car charging facilities), cycle parking, free standing and building mounted signage, trolley bay cover / enclosure, refrigeration and air conditioning plant and equipment, roof mounted solar panels, hard and soft landscaping, boundary treatments, electricity sub-station building, works and connections to water supply, wastewater and surface water infrastructure and utilities, and all other associated and ancillary development and works above and below ground level
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Haylands Dublin Road Blessington Co. Wicklow , (including Haylands House W91 FY59 , and adjoining vacant (former Blessington Commercials) premises including W91 E896 W91 HX74 & W91 C432)
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
12% of nearby decided applications were refused. The preview found 309 nearby planning records within 5 km where a location match is available.
- Matched source
- 2560657
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
Change of use of existing retail unit to a gym with small café area along with all associated site works
A housing development consisting of 13 dwelling units consisting of 6 number three storey 4 beds and 7 number two storey 3 beds with connection to services and all associated site works including roads, footpaths, boundaries and boundary treatment, public lighting, open spaces, and landscaping and a new vehicular and pedestrian entrance from Woodleigh Park along with providing pedestrian access from Woodleigh Park to the N81. A Natura impact assessment has been submitted as part of this application
A pop up swimming pool in a marquee structure along with toilet/changing facilities to be erected for a 4 month period and all associated site works
Renovations and alterations to the existing buildings on site including the demolition of a rear two storey/dormer extension and replacement with a part two storey/part single storey rear extension providing for a new two storey flat roof extension, first floor balcony and a single storey extension, the proposed works will involve the demolition of an existing lean-to greenhouse along the northern boundary (note no impacts to the boundary wall are proposed) and an existing car port, the provision of a new lean-to type storage shed to the rear of the existing stone building to replace the existing green house and a new covered garden space
The change of use of 2 no. existing meeting rooms at first floor into a sessional pre school with 2 no classrooms (98m2) with minor internal alterations and a secure external playground
Source match
Matched from public planning record 2560657The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report